宁夏北部电网供电瓶颈问题研究 study on the problem of power supply bottle neck in ningxia north power grid.pdfVIP

宁夏北部电网供电瓶颈问题研究 study on the problem of power supply bottle neck in ningxia north power grid.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
宁夏北部电网供电瓶颈问题研究 study on the problem of power supply bottle neck in ningxia north power grid

《宁夏电力》2013 年第3 期 宁夏北部电网供电瓶颈问题研究 周宗川1,2 (1. 华北电力大学, 北京 102206; 2. 宁夏电力公司经济技术研究院, 宁夏 银川 750011 ) 摘 要: 针对宁夏北部电网未来几年存在的供电瓶颈问题,按照提高地区供电能力、优化区 域网架结构的思路,通过电力系统模拟计算,提出将750 kV 电压等级引入北部地区、将宁东地 区电源以220 kV 电压等级接入北部电网负荷中心和补强月牙湖变电站主变压器及相关送电 通道3 种解决方案,并对方案进行比较。结果表明:方案1将750 kV 电压等级引入北部地区能 够为北部电网提供可靠的电源支撑,可从根本上解决北部电网近远期电力供需矛盾问题。 关键词: 电网; 负荷; 供电能力; 稳定水平 中图分类号: TM711 文献标志码: A 文章编号:1672-3643(2013 )03-0010-04 有效访问地址: / 10.3969/j.issn. 1672-3643.2013.03.003 Study on the problem of power supply bottle neck in Ningxia north power grid ZHOU Zongchuan (1.North China Electric Power University, Beijing 102206,China ; 2.Ningxia Electric Power Economic Research Institute, Yinchuan Ningxia 750011, China) Abstract: FAiming at the problem of power supply bottle neck of Ningxia north power grid in the next several years, based on the ideas of improving area power supply capability and optimizing the structure of district network frame, by simulating calculation of electric power system, puts forward three kinds of schemes: to lead 750 kV voltage level into northern area, to interconnect Ningdong area power sources as 220 kV voltage level into load center of northern center, and to strengthen the main transformer of Yueyahu Substation and relevant power supply transmission channel, and compares the three kinds of schemes. The result shows that the first scheme, to lead 750 kV voltage level into north⁃ ern area, will provide reliable power sources support for north power grid, can solve power demand and supply conflict in short and long term of north power grid. Key words: electric power grid; load; power supply capability; stabilization level DOI: 10.3969/j.

您可能关注的文档

文档评论(0)

hello118 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档