- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水利水电工程设计(Design of hydraulic and hydropower engineering)
水利水电工程设计(Design of hydraulic and hydropower engineering)
Cuhk lighting
Water and hydropower project design of 1F411020
Water and hydropower project design of 1f411020
1f411021 master the classification of water conservancy and hydropower projects and the water level of the project
Propositional point 1 water and hydropower engineering, etc
1. Water conservancy and hydropower projects are divided into five categories according to their engineering scale, efficiency and importance in the national economy, and are determined according to table 1f411021-1
@ # 2 plains
@ # sample
Example: the installed power of an irrigation pump station is 12000kw, and the installed capacity is 150 / s. The project scale of the station is () (2007).
A large (1) type b large (2) type
C medium d small (1) type
Answer: b
4. Diversion project, etc
4. Water diversion junction project should be divided according to the size of water diversion (new content)
Engineering, etc
Large scale (1) large size (2) type small (1) type small (2) type
The water flow rate (s) is greater than that of 200200 ~ 5050 ~ 1010 ~ 2 2
Proposition 2 hydraulic structure level division
1. The level of permanent waterworks
Secondary buildings for secondary buildings, such as engineering and other secondary buildings
13 th I 45
23 2 v 55
Iii 34
Water and hydropower engineering flood standard
The plain area is permanent
1. The flood standard of permanent waterworks building in the plain area shall be determined according to table 1f411021-10.
The characteristic water level and reservoir features of the reservoir
Propositional point 4 reservoir characteristic water level and reservoir features
(1) reservoir characteristic water level
1. Check flood water level. The maximum water level reached at the dam before the dam is checked by a dam. 2. Design flood water level. The maximum water level reached before the dam when the dam was designed for flood.
3. Flood control high water level. The maximum water level reached before
您可能关注的文档
- 古诗词满分解密(A full mark of the ancient poetry).doc
- 叫你如何鉴别squier 电吉他(How do you identify the squier electric guitar).doc
- 可修复伺服驱动器常见故障(Repair servo driver common failures).doc
- 可公开文本丰宝路(锦秋路~聚丰园路)、瑞丰路(锦秋路~聚丰园路) 道路(May open text fengbao road (jinqiu road ~ jufengyuan road), rayfeng road (jinqiu road ~ jufengyuan road) road).doc
- 可否选择出国做博后(May I choose to go abroad to do post).doc
- 口译体育词汇(Interpreting sports vocabulary).doc
- 古玩常识_doc(Common sense _doc).doc
- 古诗四季山水日月风(The four seasons of ancient poetry are in the wind).doc
- 各式塑料焊接工艺适应不同需要(All kinds of plastic welding process adapt to different needs).doc
- 各大专业音响知名产品网站(Major professional audio products website).doc
文档评论(0)