钻井工程2答案(Drilling engineering 2 answers).doc

钻井工程2答案(Drilling engineering 2 answers).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钻井工程2答案(Drilling engineering 2 answers)

钻井工程2答案(Drilling engineering 2 answers) I. judgment questions: 1., when locating a well, avoid mountain torrents, rainstorms, floods or landslides. () 2. high pressure test run as a bit water right, ensuring the highest pressure drilling in the highest discharge. () 3. inner flat joint is suitable for internal thickening and extra thick drill rod. () 4. the drill pipe joint is made of alloy steel whose material is higher than that of the drill pipe. () The square section of the 5. drill rod is square or six square for the purpose of transmitting the torque. () 6. roller bit teeth, milling teeth and carbide teeth two. () The 7. PDC bit is the abbreviation of a drill made of a composite block of natural diamond and tungsten carbide. () 8. drilling fluid can balance the rock side pressure of sidewall, form filter cake in the borehole wall, and seal and stabilize the borehole wall. () 9. drilling fluid can not effectively transmit hydraulic power. () 10. drilling fluid has high solid content and has no influence on drilling rate. () The wall thickness of the 11. square drill pipe is 2~3 times thicker than that of the drill pipe wall. () The generic dimension of a 12. square drill rod is the length of the square edge. () 13. the fittings of domestic drilling rod have three kinds: inner, through and normal. () 14. the performance specification of the sleeve mainly refers to the mechanical properties, size, thread type and strength of the casing steel. () 15.P-110 casing has higher hydrogen sulfide corrosion resistance. () The 16. class of drilling engineering report, well depth is equal to the length of drill and shift into the party and. () 17. the data units in the report of the drilling team shall be measured by the engineering units. () 18., soft shut in time is longer, in the process of shut in, formation fluid will continue to flow into the well, shut off casing pressure is relatively high. () 19. when the blowout preventer is closed, the ram BOP shall be switched o

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档