- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第六章 地下建筑工程(The sixth chapter of underground construction)
第六章 地下建筑工程(The sixth chapter of underground construction)
The sixth chapter: underground construction
The main contents of this chapter are as follows: 1. The construction procedure of adit; the number and arrangement of holes in adit excavation; the cyclic operation of adit excavation; the lining construction of underground works; shotcrete bolt support.
Section 1 construction procedures of underground building works
This section focuses on the construction procedure of adit, and selects the factors that should be taken into consideration in the construction procedure.
First, the flat hole construction work face
Type of [T] - hole construction period, month;
L -- the length of the adit, m;
N - number of faces;
V - flat hole construction of comprehensive progress, m/ months;
- maximum length of construction tunnel, m;
Time of the hole, m/ months.
Two, flat hole construction procedures
1 、 full face excavation
Dig the whole section into a hole at once. The lining support must be completed after the whole hole has been penetrated or after a considerable distance.
Using this method, the working scene is relatively large, the construction organization for wide and easy construction, small interference, improve the construction schedule.
2 、 sectional excavation
The whole section is divided into several layers and layered forward. Tunnel excavation section height is greater than 8m, the tunneling method commonly used fault area of more than 130 square meters at.
3, pilot tunnel excavation
Three. Construction procedure of large broken cavern
Generally considered high for low hole hole, large span small span arch principle, take the first after the bottom edge of the first core, from the top down bottom, left column dike, jump jump excavation, lining support for construction, to ensure that the surrounding rock in the construction process stable. Mainly from the following construction methods:
1, the first arch, after the wall, layered construction
In the construction, t
您可能关注的文档
- 磁盘清理,不知道有没有用 大家看看吧(Disk cleanup, do not know there is no use we look at it).doc
- 磁铁原理知识等等(Magnet principle knowledge and so on).doc
- 磁阻传感器与地磁场实验(Magnetoresistive sensor and magnetic field experiment).doc
- 磨具英语(Abrasives English).doc
- 磐石经济开发区(Economy development area).doc
- 礼仪论文摘要(Abstract etiquette).doc
- 社会医学重点(The focus of social medicine).doc
- 磁极变换(Pole shift).doc
- 社会实践感想(Social practice thoughts).doc
- 碳纤维自行车车架的研制与研发(Research and development of carbon fiber bicycle frame).doc
文档评论(0)