31液压动力爬模施工工艺标准(31 hydraulic power climbing formwork construction process standards).docVIP

31液压动力爬模施工工艺标准(31 hydraulic power climbing formwork construction process standards).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
31液压动力爬模施工工艺标准(31 hydraulic power climbing formwork construction process standards)

31液压动力爬模施工工艺标准(31 hydraulic power climbing formwork construction process standards) DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. QB Sinopec group Enterprise (general process) standard Fourth construction company By the construction volume. FCC/TS06.11-31 General construction technology of hydraulic power climbing formwork construction 2006-122006-12-20 Publishing 2007-012007-01-01 real Shi General construction technology for field installation of pressure vessel FCC/TS06.02-01 Sinopec Group Fourth Construction Company technical department issued 01-2 General construction technology of rolling power climbing formwork construction FCC/TS06.11-31 General construction technology of hydraulic power climbing formwork construction One Scope of application This standard is applicable to the construction of cast-in-place reinforced concrete structure of high rise civil buildings and high-rise buildings. Two 2.1 A) Construction preparation Material steel mould system: template should be 6mm thick steel plate processing into large template. The template used in steel, steel pipe and fittings, safety nets and comply with the corresponding provisions of the state; b) system: wood formwork panel should adopt 18mm thick high quality double coated plywood, back edges using wood beams and double channel, according to the design of assembled template climbing special mold release agent; C). Tools and equipment general climbing die equipment can be divided into: embedded parts system, rail system, hydraulic system and platform support and template system. A) embedded system consisting of: umbrella head, inner rod, cone joint, high strength bolt, pre buried sleeve, such as the wall is thick, the disposable pre buried bolt; b) rail system consists of two parts: guide bearings and H type guide rail with special H type steel manufacture. The guide bearing is connected with the guide

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档