35t_h工业链条炉计算机控制系统的设计(Design of computer control system for 35t_h industrial chain furnace).doc
- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
35t_h工业链条炉计算机控制系统的设计(Design of computer control system for 35t_h industrial chain furnace)
35t_h工业链条炉计算机控制系统的设计(Design of computer control system for 35t_h industrial chain furnace)
Liu Yong
[Abstract] because of the energy tension and environmental protection requirements, enterprises now pay more attention to the realization of boiler automatic control. In this paper, the hardware configuration and software realization of the computer control system of 35t/h industrial chain boiler are described in detail, and the realization of boiler drum water level automatic control is emphasized. The system of boiler No. 5 well in Inner Mongolia Fenghua Thermotics Inc.
Chain furnace, control system, water level control
The boiler is widely used in civil and industrial equipment, the current operation of the boiler because most control level is not high, the efficiency is generally lower than the national standard, the majority of the boiler is still in high energy consumption and serious pollution of the production state, every year because of low thermal efficiency and standard coal consumption of nearly 20 million t[1]. Therefore, how to improve boiler thermal efficiency has been paid close attention to by experts and scholars. The main customers of the Thermotics Inc is Inner Mongolia Fenghua Mengniu Group and Inner Mongolia Normal University. Mengniu Group due to the characteristics of milk production process, the use of steam, the pressure of demand is higher, and at a specific time, the amount of steam consumption, so take good control strategy to realize the automatic boiler control must be.
I. system introduction
The system is based on Advantech IPC610 as the main controller, measuring signal through Advantech PCL-813 template to complete A/D conversion into computer, the control signal is completed by the Thai PC6323 D/A conversion to send on-site implementation of the agency. The control algorithm is implemented in the script language of kingview. System software: Beijing Yakong KingView 6.5 unlimited version.
Point plate.
1.1 system scale
Analog input: (
您可能关注的文档
- 08年失业率提高是改革来首次周期性失业(08 years of higher unemployment is the first cyclical unemployment of reform).doc
- 08年材料力学(08 years of mechanics of materials).doc
- 08建筑设计标准规范(08 architectural design standards and specifications).doc
- 08江苏高考语文试题答案(包括附加题)(08 Jiangsu college entrance examination language examination questions (including additional questions)).doc
- 08考研高频词汇4-1 (王文柯)(08 postgraduate high frequency vocabulary 4-1 (Wang Wenke)).doc
- 09年全国建设工程质量监督执法检查情况的通报(09 years of national construction project quality supervision and law enforcement inspection report).doc
- 09广东学业水平测试生物答案(09 Guangdong academic proficiency test biological answers).doc
- 0rx-005卡普兰开发小史 高达世界机体简介(0rx-005 Kaplan development of the body up to the world).doc
- 1 - 2 - 1-2 认识『职场素养』 (10_29) - 副本(1-2 - 1-2 awareness of workplace literacy (10_29) - copy).doc
- 1 过滤风速问题 气布比(The 1 problem than the gas filtration velocity).doc
文档评论(0)