- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
es变频器调试指导说明(Es converter debugging instructions)
es变频器调试指导说明(Es converter debugging instructions)
ES inverter debugging guidance instructions
Summary:
ES inverter is a kind of high performance drive produced by Emerson CT company. It is suitable for synchronous motors and asynchronous motors. There are gear tractors and gearless tractors. There are unique advantages in matching synchronous machine: first of all, the drive optimization mode of speed control, increase the calculation function of S curve of flexible design, prevent the elevator in the stop process the impact of increased lift comfort; precise distance control mode, the direct docking, according to the running distance automatically the calculation speed, higher efficiency, leveling more accurate, more intelligent debugging. Secondly, zero servo drive and torque compensation function, enhances the dynamic response of the lift moment of starting, the starting will not slide down, improve the starting performance of elevator and comfort; operation curve function optimization, to simplify the control of the elevator, given by the same deceleration distance automatic calculation of velocity curve, automatic segmentation of single multi operation. Once again, all inverters are equipped with a small built-in EMC filter and brake unit, suitable for a variety of applications and the needs of various elevators.
I. wiring instructions
L1, L2, L3, for the input line of the converter
U, V, W, the output of the inverter
DC2, BR connect brake resistor
3, 5, 6, analog measurements
22, (24V user power) COM4
24, (digital input output 1) frequency converter operation signal input
25, (digital input, output 2) multi segment speed 1
26, (digital input, output 3) multi segment speed 2
27, (numeric input 4) is turning
28, (digital input 5) reverse
29, (digital input 6) multi segment speed 3
31, enabling signals
41, (relay output) frequency converter fault output
Two. Encoder wiring instructions
1 (B-, 3b), 2 (B+, 4a), 3 (A+, 2a), 4 (A-, 5b), 5 (DATA, 6b), 6 (DATA \ 1a),
11
您可能关注的文档
- 3极管极性判断(Polarity judgement of 3 pole tube).doc
- 3商法之个人独资企业法(09年司考三大本分段学习)(3 commercial sole proprietorship enterprise law (09 years and three big Scott subsection learning)).doc
- 3工艺流程图的绘制(3 drawing of process flow chart).doc
- 3章内压薄壁容器的应力化工机械与设备(The 3 chapter is about the stress, chemical machinery and equipment of the inner pressure thin-wall vessel).doc
- 3种发光字楼体发光字,led发光字,灯箱发光字(3 kinds of luminous characters building body luminous characters, LED luminous words, light boxes, luminous words).doc
- 4 工程勘察测量(4 Engineering Survey and survey).doc
- 4-6list gre红宝 txt(4 - 6list gre红宝 txt).doc
- 40cr(40铬钢).doc
- 485通信(485 communications).doc
- 42式太极拳攻防用法图解(一)(Diagram of offensive and defensive use of 42 Style Taijiquan).doc
- 2023宁德职业技术学院招聘笔试真题附答案详解.docx
- 2023安庆职业技术学院招聘笔试真题及参考答案详解一套.docx
- 2023吕梁师范高等专科学校招聘笔试真题附答案详解.docx
- 2023年云南文化艺术职业学院招聘笔试真题及参考答案详解一套.docx
- 2023嘉兴职业技术学院招聘笔试真题及答案详解1套.docx
- 2023年云南体育运动职业技术学院招聘笔试真题参考答案详解.docx
- 2023厦门城市职业学院招聘笔试真题及答案详解1套.docx
- 2023天津渤海职业技术学院招聘笔试真题及参考答案详解一套.docx
- 2023四平职业大学招聘笔试真题及参考答案详解.docx
- 2023呼伦贝尔职业技术学院招聘笔试真题及参考答案详解1套.docx
文档评论(0)