π型组合钢梁在炮采放顶煤工作面中的应用管理(Type the combination of steel mining management coal caving face in the gun).doc
- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
π型组合钢梁在炮采放顶煤工作面中的应用管理(Type the combination of steel mining management coal caving face in the gun)
π型组合钢梁在炮采放顶煤工作面中的应用管理(Type the combination of steel mining management coal caving face in the gun)
Hongling Coal Mine of Shanxi coal mining group two 1. The immediate roof is sandy mudstone fractured, easy caving, roof sandstone. Belong to the middle class II roof stability. The coal seam thickness of 3.1 7.4M, the average thickness of 6.2m, the angle of 10 to 25 DEG, a stability in hard thick coal seam. At present, there are 14 underground mining production, 15 of two districts, each district of a working face, the two face all the single pillar, with articulated beam plastic net roof support method of longwall inclined along the bottom of top coal caving mining all time high in the back all caving mining method, residual crown coal in goaf caving after back.
The fourth day of 2008 No. 14101 working face is arranged to face down the lane, all using U type steel and metal mesh with the wood support, two net section of roadway was 8.03?. Xia Xiang by I-steel shed support, on the previous working face section is small, support deformation is serious, widespread before the excavation after the bad phenomenon in the process of mining on the roadway affected by mining, support deformation is fast, seriously restricting the normal production safety. In the 14101 working face roadway with large cross section U steel yielding support, although the deformation, but can satisfy the working face safety production needs and quality standards.
To solve the two working face roadway problems, in Hongling mine before working surface stoping method used in the process of mining engineering quality management is very difficult, the canopy is uneven, column row spacing is not uniform, supporting complex processes and supporting materials, support shed is easy to deform and end support the use of non-standard, and low recovery rate, poor quality, high labor intensity of workers and other issues. In order to solve the above problems, according to the relevant state industrial policies a
您可能关注的文档
- nuke笔记(Nuke notes).doc
- nuke节点翻译(Nuke node translation).doc
- nds逆转检察官2汉化版攻略(NDS reversed the prosecutor 2 Chinese version Raiders).doc
- never summer factory tour 4 - board insiders(没有夏天的工厂参观4局人士).doc
- n大工12春《道路勘测设计》在线作业1(N 12 spring road survey and design online homework 1).doc
- og2机体代码及全修改大法(Og2 code and modify the law of the body).doc
- opa放大器的详细说明(A detailed description of OPA amplifier).doc
- oracle day06(oracle day06).doc
- oracle 10g分区表索引失效测试(Oracle 10g分区表索引失效测试).doc
- oracle ebs wip表关系(The Oracle EBS WIP table).doc
最近下载
- DB37∕T 242-2021 建筑消防设施检测技术规程.docx
- PE管材验收标准(SDR17.6).docx VIP
- 复旦大学《计算机体系结构》期末考试两套试卷(含答案).pdf VIP
- 中国近现代史纲要知到课后答案智慧树章节测试答案2025年春海南大学.docx VIP
- 形考作业3:基于UML的大学图书馆图书信息管理系统设计实验.docx VIP
- 大学《地震工程学》课程课件.pptx
- 2024年二建继续教育-基于建筑信息模型、虚拟施工及网络的项目管理理论及实践1、2答案.docx VIP
- 2024年二建继续教育-剖析价值工程及如何运用价值工程优选设计方案1、2答案.docx VIP
- 茶颜悦色案例分析.pptx VIP
- yolov9论文中文翻译.docx VIP
文档评论(0)