- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
井下工艺试题(初级)(The test process (primary))
井下工艺试题(初级)(The test process (primary))
Downhole process examination questions (primary) 180 questions
1, well control refers to the implementation of oil and gas wells (A) for short.
A, pressure control
B, oil and gas control
C and formation control
2, well control in the three early content: early detection, (A), early processing.
A, early shut in well
B and early killing well
C and early release spraying
3, when the bottom hole pressure (C) formation pressure, the wellhead back liquid is greater than the amount of pump liquid or after the pump, the automatic overflow of well fluid is called overflow.
A greater than
B equals
C, less than
4, according to the blowout fluid blowout position is different, blowout can be divided into the ground blowout and (B) two.
A, drilling, blowout
B, underground blowout
C, pipe blowout
5, (C) is a well control technique that uses hydrostatic pressure to balance formation pressure.
A and three well control
B and two well control
C, level a well control
8, well control technology can be divided into (B) level well control according to control mode.
A, two
B, three
C, four
9, overflow to prevent blowout, the only correct operation is (A).
A shut the well in time according to shut in program.
B make decisions based on construction conditions.
C, cycle observation, shut the well according to the situation.
10, overflow flow (C), the more convenient for shut in control, the more secure.
A, it doesnt matter
B, the more
C, less
11 and two level well control refers to the well control technology after the overflow or blowout occurs, through the timely shut in and pressure well reconstruction (B) balance.
A and reservoir pressure
B and borehole pressure
C and formation pressure
13 、 shut in well is a well control technique that uses (A) and wellhead back pressure to balance formation pressure together.
A and hydrostatic pressure
B and bottom hole pressure
C and riser pressure
14, the overflow is the root cause of the bottom hole pressure (B)
您可能关注的文档
- 专用条款(Special terms).doc
- 专科专业分类(Specialty classification).doc
- 专科考研(College entrance examination).doc
- 专题五 地壳运动规律和地理分异规律(Five topics of crustal movement and geographic variation).doc
- 世界3所有合成(The world's 3 all synthesis).doc
- 世界主要航线、海峡、运河的综合比较(A comprehensive comparison of the world's main route, channel, canal).doc
- 世界历史年表截至1993年(The chronology of world history as of 1993).doc
- 世界名花唐昌蒲-箭兰(World famous flowers Tang Changpu - Blue Arrow).doc
- 专业工程管理与实务——市政公用工程专业》(Professional project management and practice of municipal public engineering ).doc
- 世界地理专题复习之《世界陆地与海洋》(The world of land and sea world geography review ).doc
文档评论(0)