建筑资料员工作总结(Building materials work summary).docVIP

  • 1
  • 0
  • 约6.95千字
  • 约 5页
  • 2017-08-18 发布于河南
  • 举报

建筑资料员工作总结(Building materials work summary).doc

建筑资料员工作总结(Building materials work summary)

建筑资料员工作总结(Building materials work summary) Job summary of construction data clerk Structural part: 1., before construction, the construction unit according to design drawings requirements, strict preparation of the professional construction program, the preparation of key points work instructions, supervision units confirmed after the implementation. At the same time, in the preparation process of the team for technical disclosure, teams and groups to the construction content to know well, according to construction specifications strict requirements. In the process of construction, we should do a good job of self inspection, re examination, full inspection and three inspections of the team, and also do a good job of quality inspection and evaluation of sub sections, hidden records and related quality assurance materials. 2. in the construction process, we strictly control finished products, semi-finished products and raw materials, must have the factory certificate and product specifications. For a copy of the certificate, to the original data storage unit responsible person with chapter to copy. There are re examination requirements, must be required to meet the requirements of the standard sampling, re examination report, qualified before use. 3. in the process of reinforcing steel bars, if the welding performance or mechanical properties of reinforcing steel bars are found to be obviously bad, the chemical composition test must be done, if any problems are dealt with in a timely manner. All steel welding joints and mechanical joints shall be inspected in strict accordance with the relevant specifications. 4. the construction time of the reinforced concrete structure in this project is from August 19, 2005 to November 2005. Concrete for concrete, by XX, Shengyuan Shenghua Concrete Co. Ltd. to provide. 5. in the process of construction in strict accordance with the drawings, I change the design requirements of construction steel banding, welding, molding, formwork

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档