- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地暖施工(Floor heating construction)
地暖施工(Floor heating construction)
1. before construction began to warm, very important to the processing of the ground, the ground roughness is the main requirements, generally in accordance with the specification, surface roughness should be no more than 8mm, there are obvious uneven areas on the ground, cement sand or sand part can be used to fill the flat, but the next step of construction. At the same time should consider the requirements of the owner general storey storey, if less than 2.7m, is not recommended because the laying of floor heating, floor heating construction is completed, will reduce the height of about 8-9mm, so before doing to warm the construction of first measure the interior height.
The third section: the insulation layer
The insulation layer should be laid flat, insulation seams between layers should be tight. Direct contact with the soil or moisture into the ground, the insulation layer should be thickened 50%. Recommended insulation layer using XPS board thickness not less than 20mm, the density of not less than 33 kg / m3, the first layer thickness of 30mm extruded plate, to ensure insulation effect.
The fourth section: PE-RT pipeline installation
1. PE-RT pipe cutting, should use special tools; the incision should be flat, the fracture surface should be vertical axis.
2. PE-RT pipe installation should prohibit pipe twisting; bending pipe, arc top should be limited (counter), and fixed by clamp, to prevent the emergence of break; PE-RT tube bending radius should not be less than 6 times the pipe diameter.
3. buried in the filler layer of PE-RT pipe joints should not be.
4. PE-RT pipe should be fixed by plastic pipe clamp device, the PE-RT pipe is directly fixed on the insulation board.
5. PE-RT tube spacing fixed point, straight tube section fixed spacing should be 0.3 0.5m, bending pipe part of the fixed point spacing should be 0.2 0.3m.
Article 1 in accordance with the specification requirements, each PE-RT tube length should be control
您可能关注的文档
- 魔女之家攻略(The witch's house.).doc
- 魔法花园(The Magic Garden).doc
- 魔法花园攻略(The magic garden Raiders).doc
- 音箱和功放功率匹配的简单解释(A simple explanation of the speaker and amplifier power matching).doc
- 页游制作流程(Webpage Game production process).doc
- 顶层复式住宅预售赠送天台花园之约定无效(The penthouse roof garden residential sale gift contract invalid).doc
- 项目主办方介绍及项目品牌优势(Project organizers and project brand advantage).doc
- 项目团队组建的基本原则(The basic principle of the project team).doc
- 项目成本估算法(Project cost estimation method).doc
- 项目管理小结(Project management).doc
最近下载
- 2024新人教版九年级化学上册《第三单元 物质构成的奥秘》大单元整体教学设计.docx
- 基于化学核心素养的初中化学大单元教学设计.docx VIP
- 小学一年级安全教育《校园安全篇》课件.ppt VIP
- 2024考研408计算机基础综合真题及解析.docx VIP
- 小学新课标体育与健康水平三田径大单元18课时教案.docx
- 政治-黑龙江省哈尔滨市第三中学2024-2025学年高三10月月考试题和答案.docx
- 深静脉血栓VTE防治中心年度工作报告总结.pptx
- 【PPT课件】2024中国慢性阻塞性肺疾病基层诊疗与管理指南解读.pptx
- 骨质疏松症的治疗药物考核试题与答案.docx
- 2024年全国新能源汽车关键技术技能大赛考试题库(试题及答案).docx VIP
文档评论(0)