水保工作的详细程序步骤及所需环评资料(Detailed procedures, procedures and required environmental assessment information for water conservation work).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水保工作的详细程序步骤及所需环评资料(Detailed procedures, procedures and required environmental assessment information for water conservation work)
水保工作的详细程序步骤及所需环评资料(Detailed procedures, procedures and required environmental assessment information for water conservation work)
Plan technical assessment of soil and water conservation program
In order to make the soil and water conservation plan approval work more scientific, reasonable and perfect, according to the measures management proposal for soil and water conservation in Chongqing city development and construction projects, in the report before the formal declaration, the owner must be sent to the Department of water administration organize experts to conduct technical review.
A review procedure:
(a) the project owner or authorized program units will be Water Conservation Plan (draft in duplicate copies of seven), water conservation plan approval form a water administrative departments of the organization of expert group review.
The report should include the following attachments: (owners)
1, the NDRC project approval or filing certificate;
2, issued by the planning departments of the site submissions;
3, the land department issued land transfer documents or other approval documents;
4, mining (stone) project should have submitted to the Department of homeland map of the mining area, the exploitation and utilization of mineral resources plan and the local town street, the government agreed to opinion mining materials;
5, soil erosion of soil and water conservation facilities confirmation of the scope of responsibility and damage;
6, attorney.
(two) the water administrative department received the water conservation plan report (Draft), to determine the site inspection time and evaluation time, notify the owner of the project and the entrusted program units by telephone or in writing.
(three) from the Department of water administration organization project evaluation, the evaluation opinions issued by.
(four) planning unit to form the formal Water Conservation Plan (Draft) to the competent department of water administration (in duplicate).
(five) the water
您可能关注的文档
- 手机店开店策略(Mobile phone shop opening strategy).doc
- 手机改装(Mobile phone modification).doc
- 手机旧电池的再利用(Reuse of mobile phone batteries).doc
- 手机显示屏维修与改装(Mobile phone screen maintenance and modification).doc
- 手机记忆卡常识(Mobile memory card common sense).doc
- 手机网站开发技术(Mobile website development technology).doc
- 手绘墙制作方法(Hand painted wall making method).doc
- 手绘墙画制作方法及步骤-家居小窍门(Hand-painted wall art production methods and procedures - Home Furnishing tips).doc
- 手绘墙绘制方法及步骤(Hand drawn wall drawing method and steps).doc
- 手绘壁画介绍(Introduction to hand painted murals).doc
- 水利工程建设安全生产管理规定(Provisions on the administration of safety in production of water conservancy projects).doc
- 氧化还原反应-第一课时(Redox reaction - Lesson 1).doc
- 水利工程质量检测考试大纲(Water conservancy project quality inspection test outline).doc
- 水力机组(Hydraulic unit).doc
- 水培的一些个人经验(Some personal experience in Hydroponics).doc
- 水工结构笔记(Notes on hydraulic structures).doc
- 水性玻璃漆与油性玻璃漆(Water soluble glass paint and oil glass paint).doc
- 水暖管材分类(Plumbing pipe classification).doc
- 水泥与外加剂相容性(Compatibility of cement and admixture).doc
- 水泥加强剂的特点(Characteristics of cement reinforcing agent).doc
文档评论(0)