- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
质料员试题2(Material clerk questions 2)
质料员试题2(Material clerk questions 2)
The data of examination of basic knowledge and management practice.
Source: the original site update time: 2011-3-30 click number: 127
To determine the problem (a total of 20 questions, each question 2 points)
1, interior finishes civil engineering using the natural granite stone, artificial wood and wood-based panels shall witness sampling. (V)
2, check in the decoration, decoration engineering materials, should pay attention to plastering test report of witnesssampling inspection of cement is complete. (*)
3, computer engineering data should be used to print the contents, way of signature. (V)
4, quality acceptance batch inspection shall be conducted by the general supervision engineer (professional construction unit project leader) organization project professional quality inspector for inspection and sign. (*)
5, section (sub section) project by the chief supervision engineer (construction unit project leader) project related design unit and construction unit organization responsible person in charge of quality and technology, jointly signed acceptance. (V)
6, the quality of the photocopies of the original content should be consistent with the original store, stamped with the official seal units, indicating the location of the original, and Attn signature and time. (V)
7, all the drainage pipes shall be ball test, and record (x)
8, the contractor only received the project supervision department signed the engineering change order, before the implementation of Engineering change. (V)
9, when the contractor uses new technology and new process, the engineer should review its provide proof materials and materials for the record book. (V)
10, the work stoppage caused by the construction unit, the construction unit should fill in the engineering reopenedbaoshen table for the resumption of work. (*)
11, there is the witness sampling inspection in the construction units under the supervision of supervision by the construction unit or
您可能关注的文档
- 铁人纸模板模板.doc
- 野马8快捷方式和叉路在路上攻略.pdf
- 造纸介绍PPT.ppt
- 银色调色板技能.ppt
- 销售名流有名.doc
- 销售经典报价.doc
- 销售经验5经验.doc
- 销售采访和采访.ppt
- 银行间业务.pdf
- 销售技能升级程序.pdf
- 职业技术学校工作计划 文本文档(Vocational school work plan text document).doc
- 质监工作与转型跨越(Quality supervision and transition).doc
- 质量兴县天地宽(The quality of Xingxian world wide).doc
- 质量可追溯性(Quality traceability).doc
- 质量技术监督会上的讲话(Speech at the quality and technical supervision meeting).doc
- 质量教育(Quality education).doc
- 质量标语集锦质量标语集锦(Quality slogans, highlights, quality slogans, highlights).doc
- 质量管理,企业稳步发展的必然选择(Quality management, the inevitable choice for steady development of enterprises).doc
- 致命id 影评(致命id 影评).doc
- 质量管理如何治本更关键(Quality management how to cure the problem is more critical).doc
文档评论(0)