- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政验收专家判断题汇总(Municipal acceptance expert judgment summary)
市政验收专家判断题汇总(Municipal acceptance expert judgment summary)
Three, to determine the problem (a total of 30 questions, each question 1 points)
The 1 rings, prefabricated must be used not produced by HRB335 hot rolled steel cold drawn, not to replace other bars. (*)
2, finished products, semi-finished products, components and fittings, before use should be required to extract samples, testing organizations retest, retest results qualified before use. (*)
The soil slope should not be 3, permeability smaller covered soil permeability larger. (*)
4, after prestressing, concrete strength should meet the design requirements, the design is not required, shall not be less than the design strength of 70%. (*)
5, hot mix asphalt mixture surface deflection value should not exceed design requirements, check the number of each lane, every 30 meters, measured 1 points. (*)
6, winter backfill 500mm above the top of pipe outside the scope can be mixed into the soil, the amount shall not exceed 30% of the total volume of soil, and the frozen block size shall not exceed 100mm. (*)
7, bending point of bending to the interface distance shall be not less than the diameter, and not less than 100mm. (V)
8, water supply and drainage pipeline engineering for raw materials, semi-finished products and finished products in contact with drinking water products must comply with the relevant requirements of health. (V)
9, rain water supply and drainage pipe laying, measures should be taken to prevent the pipeline floating. (V)
10, the digester qualified full water test, should also carry out air tightness test. (V)
The rate should not exceed 3%, 11 deformation of steel or nodular cast iron pipe, the deformation rate should be no more than 2% chemical building materials pipeline. (*)
12, water treatment building floor underground, should carry out the anti floating stability checking. (V)
13, sealing anchor strength grade of concrete strength grade of concrete shall not be lower than the correspondin
您可能关注的文档
- 五菱鸿途(Wuling passers hung).doc
- 五险一金缴费比例排行 北京最高(Five social insurance and one housing fund contribution rate ranked highest in Beijing).doc
- 仙剑三-问情篇音乐鉴赏(Legend of three - piece of music appreciation course).doc
- 仙4天河经典台词(Fairy 4 Tianhe classic lines).doc
- 仙剑客栈——地图(Immortal sword inn map).doc
- 仙剑1物品属性及秘籍(Immortal sword 1 items attributes and Cheats).doc
- 仙逆相关句子(Inverse relative sentences).doc
- 享受礼仪(Enjoy the ceremony).doc
- 体系化营销破解保健品营销的困局(Systematic marketing to crack the dilemma of health care marketing).doc
- 五行简介(Five elements introduction).doc
- 市盈率与市净率(Price earnings ratio and net profit ratio).doc
- 希字帆布包自己做~~(I want to do it myself!).doc
- 希望此文能唤醒那些沉迷于模仿smi的项目和喜欢追逐暴利的梦中人(I hope this article will wake up those who are addicted to the imitation of SMI and enjoy the dream of chasing huge profits).doc
- 希格斯眼中的上帝粒子(The particle of God in Higgs's eyes).doc
- 市场占有率和销售利润率--营销总监的两难选择(Market share and profit margin -- the dilemma of marketing director).doc
- 席慕容经典诗句(Xi Murong classic verse).doc
- 心得+体会11(Experience + experience 11).doc
- 微博的特征以及发展现状分析(Analysis of the characteristics and development of micro-blog).doc
- 心得体会2(Experience 2).doc
- 心得体会4(Experience 4).doc
文档评论(0)