- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
哈工程轮机英语--lesson17分析
Lesson 17 Boiler Management General management principles and operating procedures are well known and must always be followed to avoid boiler mishaps(意外事故、损坏). In particular: With many small package boilers, the automatic control sequence usually ensures that the boiler fire is initially ignited[lighted] from a diesel oil supply, and changed over to the usual source when ignition is completed. With good management, to facilitate subsequent starting from cold, the fuel system of large boilers will have been flushed through with diesel oil when the boiler was on light duty immediately prior to being secured. When burning such diesel fuel it is essential for safety that only the correct (small) burner tip(锅炉燃烧器喷油嘴) should be used. It should be kept in mind that if fire does not light, immediately shut off fuel and vent furnace. Complete ignition of fuel in the furnace is essential. The burner flame, the smoke indicator(烟气指示器) and the funnel should be frequently observed. With satisfactory combustion, the flame should appear incandescent(发白热光的) with an orange shade(色度) at the flame tip, and a faint brownish haze(烟雾、薄雾) should show at the funnel. If on first ignition the flame is uncertain, badly shaped and separated from the primary swirler(旋流), momentary opening or closing of air register(调风门)[air regulator] may correct. The pH value of the boiler feed water should be kept between 8 and 9 and the boiler density less than 300 ppm. But, if water samples show a heavy concentration of suspended mater, short blow-downs of 20 seconds duration should be given until the sludge content is seen reduced. The boiler should be blown down when the oil burner is operating, the water level lowered and then restored to prove the functioning of the low water cut-out and the oil burner start-up equipment. The boiler scum valve should also be operated at this time to keep the water level clear from floating scum. Fuel burner components and igniter electrodes should be cleaned
您可能关注的文档
最近下载
- Y Y-T 1118-2001 石膏绷带 粘胶型.pdf VIP
- 中职语文《江姐》(节选) 知识清单.docx VIP
- 绝望的主妇经典台词1-8季中英对照.pdf VIP
- 华力液压模块车(SPMT)使用说明书.pdf VIP
- 2025年保安员(初级)考试模拟100题(含答案) .pdf VIP
- 2024四年级上册语文课课贴(彩虹版).pdf VIP
- GZ055 环境艺术设计赛项赛题15套-2023年全国职业院校技能大赛赛项赛题 .pdf VIP
- 12小学体育二年级课程纲要.doc VIP
- 粘胶型石膏绷带产品技术要求2023完整版.docx VIP
- 2025-2026学年初中数学七年级上册(2024)华东师大版(2024)教学设计合集.docx
文档评论(0)