Sewer Corrosion Protection – Onepass (u2014u2014Onepass污水腐蚀保护)
Sewer Corrosion Protection
One-pass Segmental Lining Approach
Jörg Riechers
Product Manager, Herrenknecht Formwork Technology GmbH, Germany.
ABSTRACT
Especially sewer tunnels are exposed to corrosion due to concentration of sulphuric acid.
Based on expected life span of sewage infrastructures, it is state-of-the-art to integrate a
corrosion protective layer, usually by using liners or pipes.
Segmental lined tunnel constructions are commonly divided into one-pass and two-pass
methods. The latter construction method consists of an initial ground support and a cast-in-
place concrete as a final tunnel lining. Consequently, the usable internal diameter is reduced by
installation of a liner/ pipe in connection with backfilling of its transition zone.
Conversely, corrosion protected tunnels constructed by using the on-pass lining approach offer,
among other benefits, an increased available internal diameter.
Based on a description of differences between construction methods, this paper will focus on
one-pass segmental lining which enables the integration of a corrosion resistant liner during the
casting process of segments. In this context, differences in the definition of the term one-pass
will be explained linked to the current standard of practice. Finally, an advanced one-pass
segmental lining solution will be presented and compared in terms of handling in the pre-cast
plant, feasibility and construction efficiency. Unlike other liners, this product is additionally
equipped with a liner-frame and mechanical integrated gasket, whereby e.g. welding work at
segment joints is not required after ring assembly. Thus, this lining approach rather corresponds
to the idea of a tunnel lining in one-pass and one step.
INTRODUCTION
All civil engineeri
您可能关注的文档
- SENSELESS Bicycling(毫无意义的骑自行车).pdf
- Sensor Calibration with Unknown (传感器校准与未知).pdf
- Sensor Controller S3D8 saafa(传感器控制器S3D8 saafa).PDF
- Sensor Geophones Seismic Data Processing (传感器检波器接收的地震数据处理).pdf
- Sensor Solutions for Automotive and Industrial (汽车和工业传感器解决方案).pdf
- Sensodyne Pronamel Toothpaste Sensodyne (Sensodyne Pronamel牙膏Sensodyne).pdf
- Sensorless Control of BLDC motor Samsung US(无刷直流电机无传感器控制三星).pdf
- Sensorless Field Oriented Control of 3Phase (无传感器磁场定向控制3个阶段).pdf
- SENSORS AND ACTUATORS Autoshop 101(传感器和执行器Autoshop 101).pdf
- Sensors and Actuators KELM(传感器和执行器凯尔姆经常).pdf
文档评论(0)