Sewer Corrosion Protection – Onepass (u2014u2014Onepass污水腐蚀保护).pdf

Sewer Corrosion Protection – Onepass (u2014u2014Onepass污水腐蚀保护).pdf

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Sewer Corrosion Protection – Onepass (u2014u2014Onepass污水腐蚀保护)

Sewer Corrosion Protection One-pass Segmental Lining Approach Jörg Riechers Product Manager, Herrenknecht Formwork Technology GmbH, Germany. ABSTRACT Especially sewer tunnels are exposed to corrosion due to concentration of sulphuric acid. Based on expected life span of sewage infrastructures, it is state-of-the-art to integrate a corrosion protective layer, usually by using liners or pipes. Segmental lined tunnel constructions are commonly divided into one-pass and two-pass methods. The latter construction method consists of an initial ground support and a cast-in- place concrete as a final tunnel lining. Consequently, the usable internal diameter is reduced by installation of a liner/ pipe in connection with backfilling of its transition zone. Conversely, corrosion protected tunnels constructed by using the on-pass lining approach offer, among other benefits, an increased available internal diameter. Based on a description of differences between construction methods, this paper will focus on one-pass segmental lining which enables the integration of a corrosion resistant liner during the casting process of segments. In this context, differences in the definition of the term one-pass will be explained linked to the current standard of practice. Finally, an advanced one-pass segmental lining solution will be presented and compared in terms of handling in the pre-cast plant, feasibility and construction efficiency. Unlike other liners, this product is additionally equipped with a liner-frame and mechanical integrated gasket, whereby e.g. welding work at segment joints is not required after ring assembly. Thus, this lining approach rather corresponds to the idea of a tunnel lining in one-pass and one step. INTRODUCTION All civil engineeri

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档