- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
碳纤维布加固(CFRP reinforcement)
碳纤维布加固(CFRP reinforcement)
Three, bridge carbon fiber reinforcement construction technology
1, carbon fiber reinforcement construction steps
Surface treatment of concrete components - brushing the bottom adhesive - sticking carbon fiber cloth - brushing protective adhesive - curing - coating other parts of the beam - quality inspection
2, carbon fiber reinforcement construction technology
1) surface treatment of concrete members
First, the concrete parts of the damaged surface, damaged part of the chisel, clean, and to achieve structural dense parts. Check whether exposed steel bars are rusted, and if necessary, rust removal shall be carried out. After the parts of the structural parts which are cut, cleaned and exposed, the epoxy mortar, which is higher than the strength of the original component concrete, is repaired and restored to the surface.
Crack repair: Cracks of width less than 0.2mm, with epoxy resin daub surface sealing; more than or equal to 0.2mm cracks, epoxy resin seam. (concrete construction, crack closure, construction technology)
The surface of the component protruding parts (concrete components, parts of the handover, the section of the template, such as poor) polished, smooth, the difference between the trim to smooth. The angular position, with grinder rounding, minimum radius of not less than 20mm.
Clean the surface of the polished element and make it sufficiently dry.
Before construction, according to the design drawings, the reinforcement parts should be laid and positioned.
2) brushing the base adhesive
According to the required proportion of glue, take ZHG-3 (dipping glue) A material and B material, weight ratio 3:1, pour into clean container, mixing with mixer evenly. Once the amount of adjustment should be used within the available time as the standard, more than the use of time can not be used again.
Brush with a roller brush evenly dipping glue, brushing on the pasted parts, in the lap, corner parts, more appropriate brushing.
When the
您可能关注的文档
- 男生如何打扮成女生(How do boys dress up as girls).doc
- 男性药,食补(Male drug Sibu).doc
- 男生的绝密妙招你懂得(You know the top secret trick for guys).doc
- 男靠吃女靠睡 ,养生十要 十忌(Men and women rely on sleep eating, to avoid health ten).doc
- 画册印刷纸张分类(Pictorial Printing; paper classification).doc
- 画人物速写时注意的问题--(Problems in drawing characters Sketch --).doc
- 画平行线互联网(Draw parallel lines to the Internet).doc
- 男性健康宝典远离这10大严重伤肾行为(Men's health collection stay away from these 10 serious kidney injuries).doc
- 界由清晰到模糊的全过程(The whole process from clear to vague).doc
- 留住人才的培训技巧(Training skills for retaining talents).doc
- DB44_T 2611-2025 城市排水管网有毒有害气体监测与风险分级管理技术标准.pdf
- DB44_T 2612-2025 竞赛类科普活动策划与实施服务规范.pdf
- DB43_T 2947-2024 烟草种子质量控制规程.pdf
- DB37_T 4836-2025 煤矿风量实时监测技术要求.pdf
- 叉车防撞系统,全球前22强生产商排名及市场份额(by QYResearch).docx
- 超滤膜,全球前18强生产商排名及市场份额(by QYResearch).docx
- DB62T 4172-2020 玉米品种 酒623规范.pdf
- DB62T 4160-2020 在用真空绝热深冷压力容器综合性能在线检测方法.pdf
- DB62T 4164-2020 辣椒品种 酒椒1号.pdf
- DB62T 4133-2020 公路隧道地质超前预报机械能无损探测技术规程.pdf
文档评论(0)