analysis of the composition of power system protection and fault(分析电力系统的组成和故障保护).doc

analysis of the composition of power system protection and fault(分析电力系统的组成和故障保护).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
analysis of the composition of power system protection and fault(分析电力系统的组成和故障保护)

Analysis of the composition of power system protection and fault Paper Keywords relay component failure measures Abstract This paper mainly on the role of power system protection, the composition are discussed and put forward the relevant protection measures in the relay work of great significance. A power system protection role, composition and requirements 1.1 The role of relay Components in the power system is protected when a failure occurs, protection devices automatically, to allow selective component failure cut out from the power system to ensure trouble-free part of the normal operating state, continue to be the fault components to avoid damage to reduce the scope of the blackout, if the protected component abnormal operating state, the relay device to a timely response, according to the maintenance condition, a signal to reduce the load or trip action instruction. At this point, generally do not require quick action to protect, and is the power system and its components based on the provisions of certain harmful levels of delay, to avoid unnecessary movement while the power system protection devices are also monitoring device, current and voltage measuring system in time to reflect the system equipment running. 1.2 The composition and requirements of relay protection Generally by the input part of the relay, measuring part, and output logic part of the implementation part. Signal input part of the site is generally necessary to pre-processing, such as isolation, level shifting, low-pass filter, so that the relay can physical inspection of the site effectively. measurement signal to be converted to logic signals, according to the measurement part of the output of the size, nature, logic state, the output sequence and other information, according to some combination of the logic operation to finalize the implementation of the action, the operative part of the output complete the final task. Relay should meet the basic requirem

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档