一级建造师通信与广电-1l412010机房设备及天馈线安装要求(Install a construction division of communications and broadcasting equipment and antenna for -1l412010).docVIP
- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建造师通信与广电-1l412010机房设备及天馈线安装要求(Install a construction division of communications and broadcasting equipment and antenna for -1l412010)
一级建造师通信与广电-1l412010机房设备及天馈线安装要求(Install a construction division of communications and broadcasting equipment and antenna for -1l412010)
Install the 1L412010 antenna line and equipment requirements
1L412010 master the process requirements of equipment installation in the computer room
One
What are the installation requirements for the iron parts, cables, walkways and troughs and frames in the communication room?
Answer: iron parts before installation, should check the quality of materials. No rusty, soiled or damaged material shall be used. The location of the installation or reinforcement of the iron piece shall be in accordance with the plane design drawing. Column should be vertical, vertical deviation should be no larger than the total length of the column I field. The iron beam and even solid iron should be straight without obvious bending; cable rack should be correct, uniform distance between columns; hold the iron should be in a straight line, the iron wall reinforcement at the map should comply with the design requirements; suspension should be firmly installed, the vertical column, a plurality of hanging, hanging in a straight line.
The installation position of the main walkway and groove shall comply with the requirements of the construction drawing design, and the deviation shall not exceed 50mm. The horizontal walkway should be in parallel or right angle intersection with the column frame. The deviation of the level is not more than 2mm per meter. The vertical aisle should be vertical to the ground and there is no inclination. The deviation of the verticality is not more than 1/1000. The installation of corridor hanger should be neat and firm, keep vertical, without distortion.
The wire rack shall be electrically connected and connected to the indoor protective earthing line nearby. The earthing wire shall be made of 35mm^2 yellow green multi stranded copper core cable.
The installation position of the frame shall comply with the requirements of the draw
您可能关注的文档
- 质量通病防治(Quality defects prevention).doc
- 赵武灵王(King Wuling of Zhao).doc
- 跳绳健身法(Rope skipping exercise method).doc
- 身体10大止痛部位的开关(Switch on the body's top 10 painkillers).doc
- 西咪替丁临床论文选题职称论文题目(The topic title title cimetidine clinical).doc
- 诊断学化验单(Diagnostic laboratory chart).doc
- 身体素质测试.doc
- 诊脉须识常与变_达变篇(The pulse to know and change _ up articles).doc
- 输液滥用危害大(The abuse of transfusion is harmful).doc
- 输液的计算方法(Calculation method of infusion).doc
最近下载
- 基于大模型的生成式检索.pdf VIP
- 西门子伺服操作说明书-SINAMICS_V90_OPI.pdf VIP
- 电力工程施工安全与质量控制管理.docx VIP
- Packing List-装箱单表格模板.xls VIP
- 电力工程施工安全及质量控制管理.doc VIP
- 2025年最新版硫化氢考试题库大全集.doc VIP
- [江西]发电厂2×600mw级机组“上大压小”土建工程施工组织设计.doc VIP
- 《护患沟通技巧》ppt课件.pptx VIP
- 县乡教师选调进城考试《教育心理学》题库及答案(各地真题).docx VIP
- 发电厂“上大压小”2×600MW超临界空冷机组工程土建专业主要施工方案.docx VIP
文档评论(0)