大理石干挂施工方案及工艺(Construction scheme and technology of marble dry hanging).docVIP

大理石干挂施工方案及工艺(Construction scheme and technology of marble dry hanging).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大理石干挂施工方案及工艺(Construction scheme and technology of marble dry hanging)

大理石干挂施工方案及工艺(Construction scheme and technology of marble dry hanging) Marble, granite dry hanging construction scheme and technology First, material requirements 1 stone, according to the design requirements, determine the varieties of stone color, pattern and dimensions, and strictly control, check its strength, water absorption performance. 2, expansion bolt, connection iron, quality connectors stainless steel needle supporting iron plate, nut and washer, and frame fixed design and installation required, must comply with the requirements. Two, the main equipment No tooth cutting saws, bench drill, impact drill, drill, tape, ruler etc.. Three, the operating conditions The quality and performance of the 1 parties, check whether it meets the design requirements of stone. 2, shelves, do inspection. 3, hydropower equipment and other parts have been installed to the left. The project has been completed, 4 doors and windows. 5, to do technical disclosure application personnel. Four, operation process 1, process To clean up the surface structure, structure, pop-up vertical line hanging two vertical wire angle To punch - to brush the back of stone glue, paste - flexible reinforcing materials The horizontal position, a line hanging bracket, bottom plate, bottom plate positioning, adjustment and placement of temporary fixation, irrigation, drainage, M20 cement pipe structure and drilling bolt and inserted and fixed with stainless steel fasteners. The lower wall adhesive filling hole, insert the needle to the connection hole into the wall in the upper layer of adhesive The upper panel, temporary fixed drilling expansion bolt, insert with stainless steel fasteners, with the top wall, 2, site: receipt by the person in charge, found to have quality problems, timely treatment, and is responsible for the scene of the stone pile. 3, stone preparation: selecting classification by colorimetric method on the color of the stone, the installation should be consistent in the same side o

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档