选矿机械溢流型球磨机操作维护及检修规程(Rules for operation, maintenance and overhaul of overflow ball mill for concentrator).docVIP

选矿机械溢流型球磨机操作维护及检修规程(Rules for operation, maintenance and overhaul of overflow ball mill for concentrator).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
选矿机械溢流型球磨机操作维护及检修规程(Rules for operation, maintenance and overhaul of overflow ball mill for concentrator)

选矿机械溢流型球磨机操作维护及检修规程(Rules for operation, maintenance and overhaul of overflow ball mill for concentrator) Dressing machine: operation, maintenance and overhaul rules of overflow ball mill The ball mill is part of mineral processing equipment not less than, occupies an important position in the crushing process, the main types are: energy-saving cone ball mill, ball mill, ball mill, tube mill, ball mill and roller bearing. In this paper, Xinhai machinery mainly introduces overflow type ball mill operation, maintenance and repair procedures, convenient user reference ball mill I. operating procedures: 1, before driving to check the mechanical and electrical parts, check whether the connecting bolts loose; the lubricant is normal, whether it is normal for reliable transmission, protection intact, electrical instrumentation is sensitive, good contacts brushless motor. 2, barring a week, the rotation of inspection equipment or obstructions around there, and eliminate. Start around the station were closed. 3, check the error, press the start button to start the motor, pay attention to current changes. Ball mill continuous starting shall not exceed two times, the first and second intervals of more than 5 minutes, if the third start, and electrical and fitter must cooperate with the inspection before starting. Not with other equipment, staggered start, so as not to trip. 4, after the normal operation of the mill, strictly according to the provisions of water supply, ore feeding and steel ball adding, prohibit overload operation, idling time is not more than 15 minutes, so as not to break the lining board. 5, the operation should pay attention to check whether the tank leakage, carefully observe the current, voltage, feed, water supply is normal, every half an hour check the motor and spindle temperature is not greater than 60 degrees, and found problems in a timely manner. 6, to observe the operation of the hollow shaft, oil ring with the rotation oil, hollow shaft temperat

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档