技术小题(Technical questions).doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
技术小题(Technical questions)

技术小题(Technical questions) 1, the order and method of earthwork excavation must be consistent with the design conditions, and follow what principles? Answer: slotted support, first support after excavation, layered excavation, is strictly prohibited digging principle. 2, concrete filling pile construction which items should be inspected? Answer: in the construction of the hole, slag, placed steel cage, pouring concrete and so on for the entire process of inspection. 3 、 the retention of cast-in-place concrete pile? Answer: each casting 50M3 must have 1 sets of specimens, less than 50 M3 piles, each pile must have 1 sets of specimens. 4, the foundation design level is grade A or the geological condition is complex. What test methods should be adopted to test the bearing capacity of the cast-in-place pile with low quality and low reliability? Answer: the method of static load test should be adopted to carry out the bearing capacity test. 5 for the cast-in-place reinforced concrete beams and plates whose span is not less than 4M, how much is the height of the arch when there is no specific requirement for the design of the formwork? Answer: span of 1/1000 - 3/1000. 6, fill the wall to close to the beam, plate bottom, how to detain? Answer: the construction of the hollow (GAP) gap between the infill wall and the load-bearing main structure shall be carried out after the masonry wall is filled with 14D. 7, the cantilever member bottom formwork, the concrete strength should be how much? Answer: should be designed to achieve the standard value of concrete 100% when the demolition. 8. The sub section of concrete structure is divided into several sub projects Answer: formwork, reinforcement, prestress, concrete, cast-in-place structure and fabricated structure. 9, for seismic and other requirements structure, the bending angle of stirrups bending hook should be how many degrees? What is its flat length? Answer: should be 1350, straight length of 10 times the diameter of steel

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档