技术小题(Technical questions)
技术小题(Technical questions)
1, the order and method of earthwork excavation must be consistent with the design conditions, and follow what principles?
Answer: slotted support, first support after excavation, layered excavation, is strictly prohibited digging principle.
2, concrete filling pile construction which items should be inspected?
Answer: in the construction of the hole, slag, placed steel cage, pouring concrete and so on for the entire process of inspection.
3 、 the retention of cast-in-place concrete pile?
Answer: each casting 50M3 must have 1 sets of specimens, less than 50 M3 piles,
您可能关注的文档
- 抗联密营(Anti secret camp).doc
- 护士长竞聘上岗的体会(Competition for head nurse experience).doc
- 护士证注册(Nurse card registration).doc
- 护理查房100问(100 questions of nursing ward round).doc
- 报纸、电视、广播、杂志、户外、售点、网络等七大类的各自优劣势(Newspapers, television, radio, magazines, outdoor, outlets, networks and other seven categories of advantages and disadvantages).doc
- 挤出机操作手册--电气(Extruder operation manual - Electrical).doc
- 换药的讲究--精彩啊(Dressing exquisite -- wonderful!).doc
- 推导人类社会构造原理的分析过程之八(Eight of the analysis of the principles of human social construction).doc
- 教你怎样吃枣治病(Teach you how to treat Chinese jujube).doc
- 数学必修二知识点总结!(Mathematics required two knowledge summary!).doc
原创力文档

文档评论(0)