技术小题(Technical questions) 1, the order and method of earthwork excavation must be consistent with the design conditions, and follow what principles? Answer: slotted support, first support after excavation, layered excavation, is strictly prohibited digging principle. 2, concrete filling pile construction which items should be inspected? Answer: in the construction of the hole, slag, placed steel cage, pouring concrete and so on for the entire process of inspection. 3 、 the retention of cast-in-place concrete pile? Answer: each casting 50M3 must have 1 sets of specimens, less than 50 M3 piles,