数学与技术(Mathematics and technology).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
数学与技术(Mathematics and technology)

数学与技术(Mathematics and technology) Five, scaffolding erection process and requirements Door type steel pipe scaffold design process is put to pull rod is fixed to the base floor casters from one end up door frame and then installed cross brace (plate), with horizontal frame bracing, loaded, loaded scissors, according to the above steps to install, by hand, foot shop installed at the top of the railing to tie the safety net. The following is the construction requirements of the portal frame: 1. Foundation The foundation of this project is the concrete floor and hard soil surface. When the scaffold is erected, the foot of the upright pole is directly placed on the ground, so as to ensure the carrying capacity and meet the erection requirements of the scaffold. 2. Portal frame (1) gantry steps / span, in line with the current industry standard door type steel pipe scaffolding (JGJ 128-2000) regulations, and cross support specifications. (2) the installation of the portal frame shall extend from one end to the other, and shall be changed by layer by layer, and shall not be carried out relatively. After taking a step, the level and verticality should be checked and adjusted according to the requirements. (3) the door frame and fittings shall not be mixed and used on the same foot rack. 3, accessories (1) throwing support, cross scissors support, horizontal frame or foot board should be installed immediately following the installation of the portal frame. (2) cross supports shall be provided on all sides of the door frame and locked with the latch on the upright pole of the frame. (3) the upper and lower door frames must be assembled with connecting rods and lock arms. The diameter of the connecting bar should be less than 1 to 2mm of the vertical rod. (4) on the operation layer, the hanging button type foot board matched with the frame and the door frame is fully fastened to prevent the foot board from falling off and loosening. (5) connect the door frame and the parts of

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档