江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第七章 地下防水工程(Jiangsu Provincial Construction Engineering Quality Inspector training examination of electronic reference chapter seventh underground waterproofing sheet)
江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第七章 地下防水工程(Jiangsu Provincial Construction Engineering Quality Inspector training examination of electronic reference chapter seventh underground waterproofing sheet)
The seventh chapter underground waterproofing project
1, underground waterproof grade and waterproof fortification requirements
2. Requirements for re examination of waterproof raw materials
3, underground waterproofing project quality acceptance specification - GB50208 - 2002 7 mandatory provisions.
First, individual choice questions
1. The waterproof grade of underground works is divided into (B) class.
A, 3 B, 4 C, 5
2, underground waterproofing works must be the corresponding (C) professional waterproof team for construction.
A, grade B, level C, qualification
3, waterproof concrete compressive strength and impermeability pressure must meet (C) requirements.
A, specification, D, specification, C, design
4, cement mortar waterproof layer must be combined between the solid, no (A) phenomenon.
A, B, C and hollowing of water leakage
5, waterproof roll of two pieces of coil, short and long side lap width shall not be less than (A) mm.
A, 100 B, 200 C, 10
6, plastic plate waterproof layer of bonding seam must use hot air welding, not possible (B).
A, B, C, hollowing crack leakage
7, metal plate waterproof layer of metal materials and protective materials should comply with (A) requirements.
A, design B, standard C, Party A
8, metal plate waterproof layer splicing and metal plate and construction of the anchor connector should be used (B).
A, crimping, B, welding, C, mechanical connection
9, waterproof project construction joints, concrete pouring, should be the surface (B) clearance.
A, mud, B, slurries and sundries, C, rubbish
10. The water stopping strip, water swelling rubber putty, water stop bar and joint sealing material used in detail construction must conform to (A) requirement.
A, design B, specification C, construction
11, underground continuous wall and lining struct
您可能关注的文档
- 毕业复习题在书页数和相关答案(Graduation questions on pages and related answers).doc
- 毕业生实习周记范例(Example of graduate internship week).doc
- 毕业论文 餐厅vi设计(VI design of thesis Restaurant).doc
- 毕业论文提纲(Outline of thesis).doc
- 毕业论文 经济学类 国际经济 全球经济失衡及其对中国经济的影响(Graduation thesis, economics, international economy, global economic imbalance and its impact on China's economy).doc
- 比较齐全的古典名词介绍(More complete description of classical terms).doc
- 毕业论文格式(Graduation thesis format).doc
- 毕淑敏经典语录(Bi Shumin classics).doc
- 比伐卢定(Rho Ding).doc
- 毕业论文文献摘要(Abstract of thesis).doc
文档评论(0)