江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第七章 地下防水工程(Jiangsu Provincial Construction Engineering Quality Inspector training examination of electronic reference chapter seventh underground waterproofing sheet).docVIP

江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第七章 地下防水工程(Jiangsu Provincial Construction Engineering Quality Inspector training examination of electronic reference chapter seventh underground waterproofing sheet).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第七章 地下防水工程(Jiangsu Provincial Construction Engineering Quality Inspector training examination of electronic reference chapter seventh underground waterproofing sheet)

江苏省建设工程质量检查员岗位培训参考资料考试电子小抄第七章 地下防水工程(Jiangsu Provincial Construction Engineering Quality Inspector training examination of electronic reference chapter seventh underground waterproofing sheet) The seventh chapter underground waterproofing project 1, underground waterproof grade and waterproof fortification requirements 2. Requirements for re examination of waterproof raw materials 3, underground waterproofing project quality acceptance specification - GB50208 - 2002 7 mandatory provisions. First, individual choice questions 1. The waterproof grade of underground works is divided into (B) class. A, 3 B, 4 C, 5 2, underground waterproofing works must be the corresponding (C) professional waterproof team for construction. A, grade B, level C, qualification 3, waterproof concrete compressive strength and impermeability pressure must meet (C) requirements. A, specification, D, specification, C, design 4, cement mortar waterproof layer must be combined between the solid, no (A) phenomenon. A, B, C and hollowing of water leakage 5, waterproof roll of two pieces of coil, short and long side lap width shall not be less than (A) mm. A, 100 B, 200 C, 10 6, plastic plate waterproof layer of bonding seam must use hot air welding, not possible (B). A, B, C, hollowing crack leakage 7, metal plate waterproof layer of metal materials and protective materials should comply with (A) requirements. A, design B, standard C, Party A 8, metal plate waterproof layer splicing and metal plate and construction of the anchor connector should be used (B). A, crimping, B, welding, C, mechanical connection 9, waterproof project construction joints, concrete pouring, should be the surface (B) clearance. A, mud, B, slurries and sundries, C, rubbish 10. The water stopping strip, water swelling rubber putty, water stop bar and joint sealing material used in detail construction must conform to (A) requirement. A, design B, specification C, construction 11, underground continuous wall and lining struct

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档