江苏电厂(Jiangsu power plant).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
江苏电厂(Jiangsu power plant)

江苏电厂(Jiangsu power plant) 1. Wangting power plant is a subsidiary of China Huadian Corporation in Jiangsu power plant is located in Suzhou City, Jiangsu province Xiangcheng District Wangting Town, covers an area of about 700 thousand square meters, by the end of 2008, the total installed capacity of 2 million 80 thousand kilowatts, more than 2400 employees. Ting Ting power plant was founded in 1958, a phase of the project installed capacity of 88 thousand kilowatts, two phase of the project installed capacity of 112 thousand kilowatts. In 1974 and 1976, 2 units of 300 thousand KW fuel oil units were built, of which 12 unit was put into operation in 1974. It is the first domestic 300 thousand KW unit put into operation. 1989, expand a 300 thousand KW domestic improved coal-fired units. In 1996, on the basis of the dismantling of the 10 small units of the original one or two phase project, a 300 thousand KW domestic imported coal-fired unit was built. In 2005, with the national west to East Gas Transmission project, 2 units of 390 thousand KW 9F gas steam combined cycle generating units were built. In February 2007, the national development and Reform Commission officially approved the Wangting power plant big pressure on the small reconstruction, demolition of two Taiwan extended service 30 kilowatt fuel generating units, the first to start the construction of a 600 thousand kilowatt class ultra supercritical coal-fired generating units, the unit has been successfully put into operation in June 27, 2009. Coal grinding machine maintenance monitor Mei Jianwei, maintenance department director Shen Liqiang professional director Yang Haiyin, special work Zhang Hong Sihong County Su Yuan thermoelectric Co., Ltd. Company profile: power generation Company address: Jiangsu Suqian Sihong County Qingyang Town Sun Ho neighborhood committee 6286907 Cai Jing Suqian Su Yuan thermoelectric Co., Ltd. Power generation capacity Company address: Jiangsu Province, Suqian City, Sucheng Di

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档