猫猫铅锌厂(Cat cat lead zinc factory).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
猫猫铅锌厂(Cat cat lead zinc factory)

猫猫铅锌厂(Cat cat lead zinc factory) Please conduct a specific environmental evaluation of this project: Work is the model of the mountainous terrain, natural geographical environment is poor, the general elevation of 1500m~ 2600m, the peak of Jiucaiping (altitude 2900.6m) is located in the work area. The area is strongly cut and rugged. Carbonate rocks are widely distributed and karst landforms are developed. The peaks, funnels and cliffs are more common. The surface water system is undeveloped, and the rivers are mostly seasonal rivers. It is not difficult to see that the location of the mineral deposits is far from the human living environment, suitable for mining. However, due to lead and zinc mine is a highly polluting mineral deposits, it is necessary to conduct appropriate environmental analysis. The environmental analysis is as follows: according to the construction content of the construction period of the project, the main environmental problems existing in the construction period of the proposed project are shown in: 1, atmospheric environmental impact analysis and pollution control measures The exhaust gas source of the proposed project mainly includes: mine waste gas and dust. (1) mine waste gas In the process of mining production, a large amount of waste gas is produced. In order to make the air in the mine reach the national health standard, the comprehensive control measures of combining wind with water and taking wind as the main are adopted in the project. In addition to the diagonal draft ventilation system, partial ventilation is adopted in the driving face and in the room needing independent ventilation. During drilling, wet drilling, ore spraying, water spraying, loading and unloading of ore, spraying and sprinkling are also adopted. After adopting the above measures, the project exhaust emission can meet the requirements of Table 2 of the comprehensive emission standard for air pollutants (GBl6279-1996). There is a pair of Tong Village South of th

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档