- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
各项工程施工时应注意事项(Matters needing attention in construction of each project)
各项工程施工时应注意事项(Matters needing attention in construction of each project)
The construction matters needing attention in the
- heavy engineering
The first heavy engineering level set Chun board, should indicate the height difference with the reference level, and the level of Changchun board painted Ming digging width, wall thickness, the center line of the columns, as the construction principle, a complete, detailed review by the site director and accurate inspection report, to begin excavation work. The
Second review the lofting, especially the basement and first floor, should re check all dimensions, if there is an error, correct immediately, so as to avoid future cannot be changed, the stairs and platforms, still need to draw the line that the group mode at work principle. The
When the third lofting is finished, the location of the door frame should be noted that the location is correct, vertical and horizontal, and the protective plate shall be added. The
Fourth doors and windows framed in front of concrete, iron should also be added in advance, in order to pour concrete, buried, including solid. The
When the fifth brick walls are finished, attention should be paid to fixing the door frame materials, and the recovered ones should be taken back immediately so as not to make the formwork workers cut out arbitrarily and lose the materials. The
Sixth, each floor slab pouring concrete before, in the floor around the template and each column on the horizontal height mark, as pouring concrete when the high and low credentials, before construction should check whether the doors and windows deformation or displacement. In the
- earthworks
The seventh foundation excavation should check its location, width and depth is normal, and pay attention to safety measures at any time. The
Eighth slabs of concrete shall be soaked with water before pouring concrete into each floor. The grout shall be poured into the bottom of the column and the construction joints. The ninth concrete sh
您可能关注的文档
- 个人专业技术工作总结_爱问知识人(Personal professional and technical summary of the work _ Iask).doc
- 个人基层工作科科长个人总结(Individual grass-roots work section chief personal summary).doc
- 个人事迹1(Personal story 1).doc
- 个人与组织匹配研究现状与展望管理(Current situation and prospect management of individual and organization matching).doc
- 个人独资企业、合伙企业个人所得税税前扣除办法(Pre tax deduction of individual income tax for individual proprietorship enterprises and partnership enterprises).doc
- 个人半年总结(我自己的,宣传部门文化干事)(Personal semi annual summary (my own, publicity department, cultural officer)).doc
- 个人气场的形成和提升管理(Formation and promotion management of personal Aura).doc
- 个人职业能力提升计划-教师工作计划(Personal career advancement program - teacher work plan).doc
- 个股期权考试要点(一级)(Stock option examination points (Level 1)).doc
- 个(individual).doc
最近下载
- 第七节宪法解释.ppt VIP
- 医院装饰装修施工方案(中建,103页).docx VIP
- 教科版科学三年级上册第三单元《天气》大单元教学设计.pdf VIP
- 二 《烛之武退秦师》(教案)-【中职专用】高一语文(高教版2023基础模块下册).docx
- 老年人的心理特点和常见问题复习课程知识讲稿.ppt
- 中建装饰装修施工方案.docx VIP
- 九年级上册化学知识点默写(含答案)九上化学知识点.pdf VIP
- 省社科规划项目鉴定结项审批书填写范文.doc
- 高中法制教育校本课程.pdf VIP
- 2023中国农业银行运行中心境内清算分中心(深圳)业务管理岗招聘笔试历年典型考题及考点剖析附带答案详解.docx
文档评论(0)