各项工程施工时应注意事项(Matters needing attention in construction of each project).doc

各项工程施工时应注意事项(Matters needing attention in construction of each project).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
各项工程施工时应注意事项(Matters needing attention in construction of each project)

各项工程施工时应注意事项(Matters needing attention in construction of each project) The construction matters needing attention in the - heavy engineering The first heavy engineering level set Chun board, should indicate the height difference with the reference level, and the level of Changchun board painted Ming digging width, wall thickness, the center line of the columns, as the construction principle, a complete, detailed review by the site director and accurate inspection report, to begin excavation work. The Second review the lofting, especially the basement and first floor, should re check all dimensions, if there is an error, correct immediately, so as to avoid future cannot be changed, the stairs and platforms, still need to draw the line that the group mode at work principle. The When the third lofting is finished, the location of the door frame should be noted that the location is correct, vertical and horizontal, and the protective plate shall be added. The Fourth doors and windows framed in front of concrete, iron should also be added in advance, in order to pour concrete, buried, including solid. The When the fifth brick walls are finished, attention should be paid to fixing the door frame materials, and the recovered ones should be taken back immediately so as not to make the formwork workers cut out arbitrarily and lose the materials. The Sixth, each floor slab pouring concrete before, in the floor around the template and each column on the horizontal height mark, as pouring concrete when the high and low credentials, before construction should check whether the doors and windows deformation or displacement. In the - earthworks The seventh foundation excavation should check its location, width and depth is normal, and pay attention to safety measures at any time. The Eighth slabs of concrete shall be soaked with water before pouring concrete into each floor. The grout shall be poured into the bottom of the column and the construction joints. The ninth concrete sh

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档