施工题(Construction problems)

施工题(Construction problems) First, fill in the blanks (1 points per minute, totaling 20 points) 1. in earthworks, according to the ease of excavation of soil - the soil is divided into eight categories. 2., the method of lowering the water table is water accumulation, dewatering and well point precipitation. 3. general internal wall plastering construction technology: construction preparation, base treatment, plastering - cake, red bars, corner, plastering -. 4. - Design of pile length of friction pile to control hole depth, end bearing pile to._ penetration into the main control hole depth. 5.