- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砌加气砼砌块墙(Aerated concrete block wall)
砌加气砼砌块墙(Aerated concrete block wall)
Aerated concrete block wall
The technical disclosure applies to general industrial and civil buildings, autoclaved aerated concrete block wall masonry works.
1. material requirements
(1) autoclaved aerated concrete blocks are generally made of 600 * 200, 600 * 250 and 600 * 300 (mm) thickness modules of 25 and 60, respectively
(mm) aerated concrete blocks of two carry units.
Its strength: when the dry density is 500kg / m3, the grade is MU3, and when the dry density is 700kg / m3, the grade is MU5. Design regulation
For other dry density and strength grades of autoclaved aerated concrete blocks, the quality shall comply with the Ministrys standards and autoclaved aerated concrete blocks
(JC31582) the requirements of the indicators.
(2) cement: Ordinary portland cement or slag Portland cement No. 325 or above.
Sand: medium sand, containing more than 5% of the mud, over 5mm aperture screen.
(3) polyvinylformal (107 glue), precast concrete block, brick, anchor plate (75 x 50 x 3mm) phi 6 Phi 10 steel, grilled
Nail (phi 4 phi 6), small wedge etc..
2. main machines and tools
(1) the background measurement equipment, mixer, 5mm sieve, trolley, shovel, shovel, saws, engraving tool belt tooth edge, Cao drill, hammer line,
Supporting board, small white, ash bucket, ash spreading shovel, hammer, small bucket, bucket level, mortar and vertical transportation tools etc..
3. operating conditions
(1) site storage facilities should be solid, smooth, not water, should be neatly stacked. The shipment should be handled with care and avoid damage. And try to reduce
Two times out of luck.
(2) according to the wall size and block specifications, the design of masonry panel layout shall be properly arranged, and the on-site cutting capacity shall be reduced as much as possible. Masonry
Block thickness and structure clearance height and size of doors and windows, arrange layout of facade and section to avoid waste.
(3) place the block of aerated concre
您可能关注的文档
- 探迷建筑业低产值利润率现象(Probing the phenomenon of low value profit in construction industry).doc
- 损坏word文档修复十大技巧(Ten major techniques for restoring damaged word documents).doc
- 推广会,如何让第三终端客户心仪(Promotion meeting, how to make third terminal customers favorite).doc
- 推理中的凄凉与暖色(The bleak and warm colors of reasoning).doc
- 提拔客户办事的七把金管理钥匙(Seven golden keys for promotion of client affairs).doc
- 提高投资途径(Ways to increase investment).doc
- 提出了马克思主义基本原理和中国实际第二次结合的必要性和重要性(It puts forward the necessity and importance of the second principles of Marx doctrine and China's actual two combinations).doc
- 推动企业年金发展管理 完善养老保障制度(Promote the development of enterprise annuity management, improve the old-age security system).doc
- 挽救年夜兵中国该怎样管理定夺(How to manage China's decision to save the army).doc
- 提高科技意识培养科学素质_1461(Raising the consciousness of science and technology and cultivating scientific quality _1461).doc
文档评论(0)