仪表巡检(Instrument inspection).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
仪表巡检(Instrument inspection)

仪表巡检(Instrument inspection) First, do a good job in Japan tour inspection + c: K (I: DA4 J6 Z5 S T9 B Instrument workers generally have their own range of instrument inspection, according to the distribution of the instrument under the circumstances, select the best patrol route, inspection at least two times a day. During the circuit check, the instrument operator should know the operation of the instrument on the spot and deal with the problems in the operation of the instrument. E4 ^2% d0?! K/! U6 a, H V (instrument inspection, mainly for the following items: (A6 J% F5 U R3 _ |+? 4. 1, check the instrument instructions, records are normal, the scene of a meter and control room display instrument, adjustment instrument indication value is consistent, regulator output indication and control valve position is consistent. 0, Q0, R/, Q6, U, K, R, R7, n 2. Check the instrument power supply (AC220V or DC24V) and whether the air source (0.14MPa) is in the normal range. M*, n%, c$, f%, p/, Z#, ~5, / N3, check instrument insulation and heat tracing.. W.. K; B [1 x, |! @9 F 4. Inspect the instrument body and fittings for damage and corrosion. V- SL / N) ^+ 5, check the instrument and process interface leakage. G, a, ~5, H8, X%,]0, W 6. Check the instrument in good condition. The condition of the instrument in good condition may be checked with the regulations of equipment maintenance and repair issued by the Ministry of chemical industry. 4, Q, j, R7, I3, J, W1, P7 \ O two, do a detailed sewage plan, regular blowdown Q- J (K# T) ` regular blowdown is mainly aimed at easy condensing, easy crystallization and easy deposition media instruments. This work should be in accordance with local conditions, and not all process inspection instruments need regular blowdown. 3]* U1 f/ ZR. g- P1, {; P g C$M2 6 emission P S The sewage is mainly for the differential pressure transmitter, pressure transmitter, float level gauge and other instruments, as measured medium containing dust, grea

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档