- 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
- 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
- 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
施工组织设计 0.目 录
目 录 ··························· 1
1. 工程概况 ························· 1
1.1. 工程范围 ····························1
1.2. 自然条件 ····························1
1.2.1. 气象及水文条件 ························1
1.3. 工程地质条件 ··························2
1.4. 施工条件 ····························4
1.4.1. 对外交通条件 ·························4
M
O
1.4.2. 施工现场条件 ·························4
C
.
1.4.3. 材料供应条件 ·························4
G
1.4.4. 施工用水条件 ·························5
N
O
1.4.5. 施工通讯条件 ·························5
L
U
1.5. 主要工程量包括: ························5
H
1.6. 工程特点、施工重点和难点 ····················6
Z
.
1.6.1. 本合同工程特点是: ······················6
W
W
1.6.2. 施工重点: ··························6
W
1.6.3. 施工难点: ··························6
2. 施工承诺和施工组织管理 ·················· 8
网
2.1. 施工承诺 ····························8
龙
2.2. 履约承诺 ····························8
筑
2.3. 工程质量承诺 ··························8
2.4. 施工工期承诺 ··························8
2.5. 施
文档评论(0)