- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Product Phase-Out Guideline-产品线关闭指导
Flextronics Best Practice
APPROVALS DOCUMENT TITLE DEPT NAME TITLE DATE Phase-Out Guideline Flex Factory Scott Froelich America’s Flex Factory Bengt Kvisth Europe Flex Factory HS Lim Asia Eng Best Practice Murad Kurwa America’s Eng Best Practice Peter Back Europe Eng Best Practice KC Ong Asia FPLC Champion Milton Dean America’s/Eastern Region
DOCUMENT NUMBER
REVISION
SHEET FBP-ENG130 B 1 OF 6
REVISION HISTORY
REVISION DESCRIPTION OF CHANGE ORIGINATOR RELEASE DATE A New Release Joseph Kaiser /Tom Gilley 28 Aug 2002 B Added definitions and corrected typos, added reference to checklist in 4.2 6.1 Milton Dean 22 Oct 2002
AFFECTED GROUPS: All groups
REFERENCE (S):
FBP-ENG001 - FPLC Guideline
FBP-ENG003 - FPLC Presentation
FBP-ENG131 - Phase-Out Checklist
SAFETY: See Flextronics EHS Policy
OBJECTIVE / PURPOSE
This document provides the guidelines for the phasing out of products and services.
SCOPE
This Guideline is for all operations worldwide and all personnel involved with the production ramp down and complete Phase-Out of customers products or services.
This document is limited to the Phase-Out portion of the Flextronics Product Life Cycle.
DEFINITIONS
AR - Accounts Receivable
AP - Accounts Payable
FPLC – Flextronics Product Lifecycle
RMA – Return Material Approval
NCNR – Non Cancelable / Non-Returnable
MRP – Materials Requirements Plan
WIP - Work In Progress
REQUIREMENTS / POLICY
Each facility involved in the Phase-Out of products or services should apply these guidelines as appropriate for each unique customer situation.
The Phase-Out checklist FBP-ENG131 should be used to aid in the planning and control of the phase-out project. This checklist can be modified to meet specific needs.
Upon receipt of project Phase-Out notice from the customer, the Program Manager or Project Manager should form a team and initiate project Phase- Out meetings with all relevant departments to
您可能关注的文档
- endNoteX2的使用.ppt
- 实验四 WEB服务器配置.ppt
- IIS+PHP+MySQL+Zend_Optimizer+GD库+phpMyAdmin安装配置及问题解决【配图】.docx
- IIS7简介与基本配置.ppt
- oracle考试试题.docx
- 实验-WEB站点的配置.doc
- 1 第1讲uptech.ppt
- IIS建立Webmail的站点.doc
- oracle plsql考试试卷.doc
- 信息检索—CNKI.ppt
- 班组长如何开好班前会.pptx
- 高血压病的诊断与分类.pptx
- 2025年定西市重点中学高二化学第二学期期末监测试题含解析.doc
- 重庆市江津区达标名校2025年初三下学期5月考化学试题试卷含解析.doc
- 莆田学院《风险投资理论与实务》2023-2024学年第二学期期末试卷.doc
- 兴义民族师范学院《计算机接口技术实验》2023-2024学年第一学期期末试卷.doc
- 低频电疗法技能考核评分标准.pptx
- 油画培训课件.ppt
- 2024-2025学年四川省宜宾市南溪区第三中学八年级物理第一学期期末统考模拟试题含解析.doc
- 河北中医药大学《语言编程与数据可视化》2023-2024学年第二学期期末试卷.doc
原创力文档


文档评论(0)