PLC建筑电梯控制系统毕业论文中英文资料外文翻译文献.doc

PLC建筑电梯控制系统毕业论文中英文资料外文翻译文献.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PLC建筑电梯控制系统毕业论文中英文资料外文翻译文献

中英文资料外文翻译文献 Application of PLC in the Elevator Control System of Intelligence Building Abstract: The paper mainly discusses one subsystem of intelligence building system: the elevator control system. The PLC strong ability in interference and so on makes the elevator industry one after another to apply the PLC to the elevator control system in order to replace the relay being used in traditional elevator control system. The Application of PLC in the Elevator control system reduces the breakdown rate and efficiently improves the operating reliability of the elevator with safety .The structure of system is also simple and tightly packed.The working principle of the elevator control system is: The spot control information is send into the PLC from the customer input devices firstly, then the PLC control cabinet is required to send out the control signal to drive the equipments according to the system demands. The elevator can then proceed the homologous action according to the control request .The paper selectsOMRON company’s C200HE series PLC, introducing parts of signal hookup of the elevator control system and explaining the function of the control cabinet. Lastly the automation programming is introduced. Simulated experiments enunciates that the design method is viable. It can make the personnel of the industry management center to long-distance monitor and control the elevator in control center, to connect the elevator control system with intelligence building industry management system by Ethernet or special-purpose network such as Lon Works.The elevator working state can also be timely watched.These not only can realize scientific centralized management of the elevator, but also can lower the elevator maintenance cost etc. It is one of the developing direction of intelligence building elevator control system. Keywords: PLC; intelligence building; elevator control system; working principle; program design Ⅰ. Introduction In 1980s The first intelligence mansio

文档评论(0)

xjj2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档