Trial Template - EWEA:试用模板-欧洲风能协会.ppt

Trial Template - EWEA:试用模板-欧洲风能协会.ppt

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Trial Template - EWEA:试用模板-欧洲风能协会

EWEC 2006 National Technical University of Athens Contents The Clean Development Mechanism The scope of the presentation Pre-selection of host countries Financial analysis of wind energy projects Results without CDM Results with CDM Sensitivity Analysis Conclusions Flexible Mechanisms A co-operative framework within the Kyoto Protocol Annex-I countries: to meet their commitments in the most cost-effective way non-Annex-I countries: to support sustainable development Emissions Trading Joint Implementation Clean Development Mechanism Clean Development Mechanism Article 12 of KP: “any Annex I country or any licensee legal entity of Annex I country is allowed to be credited for emissions reductions achieved by investing in projects located in non-Annex I countries” Questions Is wind energy an appropriate type of CDM project? Is CDM an appropriate tool for the development of wind energy exploitation in developing countries The scope of the presentation To demonstrate the effect of CDM on typical Wind Energy projects To identify attractive investment opportunities on wind energy in smaller CDM markets (of particular interest for Greek investors) To investigate the impact of key-parameters on the project’s profitability Existing CDM projects (1) Existing CDM projects (2) Geographical distribution of Wind projects Project specification Capacity: 51 MW (60 x 850 kW) Hub height: 60 m Rotor diameter: 52 m Investment cost: 1000 €/kW Operational and Maintenance cost: 15 €/kW,year Assumed to be the same in all host countries Data Requirements Without CDM Load factors Electricity tariffs With CDM Load factors Electricity tariffs + Baseline emission factor Value of CERs Load factors Electricity prices Results of Financial Analysis Baseline Emission Factors Calculated on the basis of local data as the average of: Operating margin: existing electricity system Build margin: recent additions to the

文档评论(0)

153****9595 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档