- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
讲义总结建筑工程质量管理基本工具及方法培训讲义(260页,14种方法)
* 5 This slide adds the ‘post-it’ worksheet used for the actual calculations. This slide advances automatically. * 6 Here the range for the first observation is calculated. * 7 The range value is added to the original data list in the appropriate row. This slide advances automatically. * 8 In a similar fashion the mean value is calculated and added to the data set. The arrow will disappear in a few seconds leaving just the calculations. This is a good opportunity to review the steps of the calculation. This slide advances automatically. * 9 * 10 This slide removes the ‘post-it’ note and fills in all the range and mean values for the five observations. * 11 To complete the exercise, the R-bar and grand mean values are calculated and added at the bottom of the appropriate columns. * 13 The data set is replaced by a worksheet showing the given values for R-bar and the appropriate equations for the R-chart. The following segment will show x-double bar. * 14 It is necessary to select the values for D3 and D4 from Table 5.1 in the text. Part of the Table is reproduced here to demonstrate the proper use of the Table. * 15 Here the correct sample size (not the number of samples, a mistake many students make) is highlighted along with the appropriate values of D3 and D4. * 16 Removing the Table, the values are now shown on the worksheet. * 17 In this slide the values are substituted into the UCL equation and the resulting value is shown. * 18 In a similar fashion, this slide shows the substitution and calculation for the LCL. The arrows will disappear after a few seconds leaving only the calculations. * 19 This slide can be used to review and discuss the calculations. * 20 This slide shows the blank control chart for the R-chart with the mean and control limit values already plotted. This is a screen shot from the OM Explorer software. The process Range is comfortably in control. (The picky person might suggest there is not enough variability in the process, but
原创力文档


文档评论(0)