- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国际海事组织通过强制性压载舱涂层标准 pr34
No.34
No. IACS Procedural Requirement on Application of
No.
34 the IMO Performance Standard for Protective
34
(Dec
(cont’d) Coatings (PSPC), Resolution MSC.215(82),
2006)
under IACS Common Structural Rules for Bulk
Carriers and Oil Tankers
1. IACS Procedure for Coating System Approval
Type Approval Certificate showing compliance with the PSPC section 5 shall be issued if the
results of either method A+D, or B+D, or C+D are found satisfactory by the Society.
Method A: Laboratory Test
1.1 Coating pre-qualification test shall be carried out by the test laboratory which is
recognized by the Society and meets the requirements set out in IACS UR Z17
paragraphs 4, 5, 6 and 7 (except for 4.6 5.3) as below.
1.2 Results from satisfactory pre-qualification tests (PSPC table 1, paragraph 1.3 of the
PSPC) of the coating system shall be documented and submitted to the Society.
Method B: 5 years field exposure
1.3 Coating manufacturer’s records are to be examined to confirm coating system has 5
years field exposure.
1.4 A joint (coating manufacturer/Society) survey of all ballast tanks of a selected vessel is
to be carried out for the purpose of verification of compliance with the requirements of
sections 1.3 and 1.7. The coating manufacturer’s representative is to be qualified as
defined in 2.2.
1.5 The selected vessel is to have ballast tanks in regular use, of which:
• At least one tank approx 2000 m3
• At least one tank shall be adjacent to heated tank and
• At lea
您可能关注的文档
最近下载
- 2024人教版PEP四年级上册英语《Unit 5 The weather and us》第一课时课件.pptx VIP
- 2025年统编高中语文必修上册第一单元知识点归纳.docx VIP
- 人教版道德与法治三年级上册第7课《走近我们的老师》课件.pptx VIP
- 外研版(2025)必修 第一册Unit 4 Friends forever Understanding ideas—Reading comprehension课件(共37张ppt)(含音频+视频).pptx VIP
- 哈弗 H5说明书使用手册.pdf VIP
- 岗位序列、职等职级和薪酬管理规定以及划分制度-一职四薪.pdf VIP
- TZS 0680—2025《医疗机构实验室生物安全管理组织架构规范》(水印版).pdf VIP
- 抗癌药物研发工作计划.docx VIP
- 望色要领.PPT
- 设计质量保证措施.docx VIP
文档评论(0)