- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
拉法基水泥集团--设备调试说明30
Test Commissioning
Electrical: Energizing MCC No of pages
/ Equipment Item: Issue Date: 11th Oct., 2008 Rev: R00 Item N°
Sheet No.
Checking before Energizing
送前前检查 Erection
安装 MCC cabinets have been erected ; incoming cables have been test and connected the incoming of MCC
MCC柜已安装完成,MCC进线电缆测试并已连接至MCC进线柜
Earthing system for子MCC is installed
MCC接地系统已完成
Lighting in switch-room is normal operation
电力室内照明已完成
Fire detection system in switch-room is normal operation
火灾报警系统安装已完成
Each emergency Shut-Downs for switch-room has been installed
电力室紧停开关已安装完成
Civil works for switch-room has been finished
电力室土建工程式已完成
□
□
□
□
□
□
Security Check
安全检查 No debris in electrical room,
电力室内无杂物
All feeder of MCC have been take out and locked
MCC所有回路已拉出,并已上锁,
Fire detection system are normal operation;
火灾报警系统已能正常工作;
Lighting is normal operation
照明正常
Earthing for MCC has been finished
MCC接地已完成
Emergency Shut-Down has been erected
紧停开关已安装完成
Necessary warning plates have been erection in the witch-room
必须的警告牌已准备好
The doors for electrical room can be locked
电力室门能够上锁
□
□
□
□
□
□
Electrical check
电气检查
Clean the electrical room, no debris in electrical room,
电力室内清理干净,室内无异物;
Clean the MCC cabinet,
清理MCC柜
Check the cables erection conditions, such as fixed, no mechanical damage, good arrange and seal.
检查电缆接线是否已完成,电缆布置是否合理,电缆排列整齐,固定是否可靠,接线室内是否密封良好
I/O lists between PLC to MCC incoming have been checked.
MCC 进线柜至PLC的I/O点已检查;
Setting value for protection of MCC incoming breaker has been done according to drawings requirement.
MCC进线柜保护设置已根据图纸设定完成
Temporary auxiliary power from ACC and UPS have been normal operation,
临时辅助电源,UPS电源已正常工作
The door of electrical room can be locked
电力室门能够上锁 □
□
□
□
□
□
□
Electrical test
电气测试
Insulation for MCC bar bus and breaker meet the requirement
MCC母线与断路器回路压侧绝缘测试满足要求
Insulation for LV cables meet requirement, the cables connect is correct,
低压动力电缆绝缘满足要求,电缆接线正确
Ensure the Operation of breaker on MCC incoming in normal operation, the status is