- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(WORD)-土石坝外文翻译---土石坝及溢洪道设计-其他专业
The Design of Earth-Rock Dam and Spillways
Part 1 Embankment Dams
Selection of embankment type:
rockfill. The selection is dependent upon the usable materials from the required excavation and available borrow. It should be noted that rockfills can shade into soil fills depending upon the physical character of the rock and that no hard and fast system of classification can be made. Rocks which are soft and will easily break down under the action of excavation and placement can be classified with earthfills. Rocks which are hard and will not break down significantly are treated as rockfills.
The selection and the design of earth embankment are based upon the judgment and experience of the designer and is to a large extent of an empirical nature. The various methods of stability and seepage analyses are used mainly to confirm the engineer’s judgment.
Freeboard :
All earth dams must have sufficient extra height known as freeboard to prevent overtopping by the pool. The freeboard must be of such height that wave action, wind setup, and earthquake effects will not result in overtopping of the dam. In addition to freeboard, an allowance must be made for settlement of the embankment and the foundation which will occur upon completion of the embankment.
Top width :
The width of the earth dam top is generally controlled by the required width of fill for ease of construction using conventional equipment. In general, the top width should not be less than 30 ft. If a danger exists of an overtopping wave caused either by massive landslides in the pool or by seismic block tipping, then extra top width of erosion resistive fill will be required.
Alignment :
construction costs but such alignment should not be such as to encourage sliding or cracking of the embankment. Normally the shortest straight line across the valley will be satisfactory, but local topographic and foundation conditions may dictate otherwise. Dams located in narrow valleys often are given an alignment which is
您可能关注的文档
- (DOC) 移动式钢筋存料棚在京沪高铁济南西客站工程中的应用.doc
- (2doc)湖南省衡阳市衡东兴辉废矿物油收集有限责任公司年收集、储存及转运2000吨废矿物油建设项目环评受理公示_127733_.doc
- (DOC)-2012年一级建造师考试建设工程经济真题及答案详细解析.doc
- (doc) 钱锺书《谈艺录》中的李贺诗歌论.doc
- (DOC)-2013年牧宝皮业皮具公司员工奖惩管理制度DOC-人事制度表格.doc
- (DOC)-2013年牧宝皮业皮具公司员工福利管理制度DOC-人事制度表格.doc
- (DOC)-2013年全国各地市中考英语试卷分类解析汇编:短文填空.doc
- (DOC)-2015-2016学年度译林版英语四年级下册期末评估测试卷及答案_图文.doc
- (DOC)-220KV变电站电气部分毕业设计(完整版)(开题报告 任务书 设备清单 文献综述 毕业设计).doc
- (DOC)-Flash动画外文翻译-其他专业.doc
- (WORD)-土木工程外文翻译---建筑施工混凝土裂缝的预防与处理-建筑结构.doc
- (WORD)-初中物理经典易错题100列 4.doc
- (WORD)-外文文献翻译---我国汽车工业的自主开发-汽车设计.docx
- (WORD)-城市交通规划外文翻译-交通线路.doc
- (WORD)-外文翻译----HTML教程-其他专业.doc
- (WORD)-外文翻译---正在改变汽车金融的三大趋势-汽车设计.docx
- (WORD)-外文翻译--区域物流能力与区域经济关系研究-其他专业.doc
- (WORD)-外文翻译--第三方物流企业的作业成本法-其他专业.doc
- (WORD)-外文翻译--心理因素影响购买行为-其他专业.doc
- (WORD)-学前教育毕业论文--小小环保卫士教育活动设计方案-毕业设计.doc
文档评论(0)