- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型水工预应力渡槽的温度应力分析研究
外文资料
原文:
Thermal Stress Analysis of A Hydraulic Prestressed
[Abstract] Large scale aqueduct is adopted as a optional plan for the crossing yellow river structure of the project of transferring water from the South to the North. Prestressed reinforced concrete structure is the best choice. The designed aqueduct span is 50m. Self-weight of the upper part of the structure for one span is 15.93MN, and corresponding weight of the water in one span is19.85MN. The stress in every part of the structure varies largely. As the project is located in the area that has large temperature variation, the thermal stress produced in the structure by the variation of the surrounding temperature is a big problem. In this paper, the thermal stress in the aqueduct is studied for all possible conditions, and suggestions to guarantee the safety of the aqueduct under possible large temperature variation is made.
[ Keyword ] hydraulic aqueduct; prestressed reinforced concrete; thermal stress;
1 preface
South-North Water Diversion centre line wear Huang aqueduct engineering design adopt one pair of troughs to pass water, the top structure of the aqueduct selects the U aqueduct for use, it is 4m to cross water section interior radius of underpart semicircle, the top of the semicircle trough is the straight wall and wing reason board, design 5.13m of depth of water , the clear width 8m of the aqueduct in the trough . The minimum thick middle part of wall of section is 0.35m, the tip is 0.5m, is 0.85m that the position part of the baseplate is thickenned in stepping, thick 1.35m of tip. The trough carries section 0.5m * 0.5m of the crossbeam , interval 5m. Tall 7.45m of trough , single total wide 9m of trough , horizontal total wide 19m of pair of troughs , trough minimum and net from 1m. The top grade of intensity of structure concrete is C50.
Mound cap level measurement is 19.0m * 5.0m, thickness 2.8m. Mound cap have horizontal antidetonation block lump and cushion stone, horizontal to blo
文档评论(0)