第8章-计算机、网络平台和BIM在建设项目管理中应用.ppt

第8章-计算机、网络平台和BIM在建设项目管理中应用.ppt

  1. 1、本文档共69页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* BIM应用—Mountain View医院综合办公楼 Zero conflicts between various systems(各系统中零冲突) Less than 0.2% rework(0.2%返工) Productivity improvement of more than 30% for the mechanical contractor(机电系统〉30%的生产效率的提高) Less than two hours per month spent on field coordination issues by the superintendent of the general contractor(总包单位工地协调2H/M) Only two field issues related to Requests for Information (RFI)(2个变更单) Zero change orders related to field conflict issues(工地冲突相关的变更为0) 10/31/2014 564 第806讲 BIM技术的功能和应用 2/9 * BIM效果—Stanford对32项目的调研结果 Up to 40% elimination of unbudgeted change. 预算外变更减少40%以上 Cost estimation accuracy within 3% 造价估算准确率在3%以内 Up to 80% reduction in time taken to generate a cost estimate. 投资估算工作时间节省80% A savings of up to 10% of the contract value through clash detections. 冲突检查可节省合同额的10% Up to 7% reduction in project time. 项目时间节省7% 10/31/2014 565 第806讲 BIM技术的功能和应用 3/9 * BIM应用:颠覆性创新 (资料来源:参考Slaughter (1998, 2000)进行整理) 2D CAD BIM 突破性 跨组织性 10/31/2014 566 第806讲 BIM技术的功能和应用 4/9 * BIM应用效益和展望 The official definition of Open BIM Open BIM is a universal approach to the collaborative design, realization and operation of buildings based on open standards and workflows. Open BIM is an initiative of buildingSMART and several leading software vendors using the open buildingSMART Data Model. 10/31/2014 567 第806讲 BIM技术的功能和应用 5/9 * BIM应用阶段的划分及其特点 10/31/2014 568 第806讲 BIM技术的功能和应用 6/9 Stages x’ w w’ h h’ Q S C O Pre-BIM Object-based Modeling Model-based Collaboration Network-based Integration x’: Project Information obtained by traditional methods; w: Payment obtained by contractor; w’: Payment capacity of Owner; h: Contractors’ effort in project without BIM; h’: Contractors’ effort in project with BIM; Q: Information of project quality; S: Information of project schedule; C: Information of project cost; O: Other project information Information which can be obtaine

文档评论(0)

moon8888 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档