- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钻井HSE作业手册的环境保护
10 Environmental Protection
10.1 General
Every personnel at rig site have the responsibility to protect environment and prevent it from pollution. All employees have the responsibility to work in an environment-friendly manner. Managers and supervisors shall ensure that the required systems and procedures are in place and to be used while the rest of the workforce is obligated to comply with these guidelines faithfully and consistently.
The work on environmental protection generally should be in accordance with the Environmental Impact Assessment (EIA). The EIA report approved by the local government should be offered by the client. And expense related to environmental protection in EIA report should be paid by the client.
The content of EIA report is briefly introduced in section 10.2, The practices which are taken to eliminate the influence and damage to local environment during the drilling operations are introduced from section 10.3 to section 10.10, including the handling of mud, cuttings and chemicals used in well drilling, solid waste management, wastewater disposal and water resources conservation, exhaust emission and atmosphere conservation, ecological conservation and rig site restoration, etc. Drilling operation should be performed in accordance with the EIA report.
Procedures are put forward herein as a reference and reminder to drilling personnel to make them be aware of the environment protection at all times.
10.2 Evironmental Impact Assessement(EIA)
EIA should be performed by the client according to the contract or actual condition.
EIA is generally performed at the feasibility study stage of the project.
If there is an EIA guideline from local government, the guideline shall be followed during the EIA process. If there is no such guideline in local place, relevant international practices and standards shall be applied.
The content of EIA report should include but not limited to the following items:
The preface shall give a short description why t
您可能关注的文档
- 野外休闲度假别墅的设计的方案.docx
- 野生菌美食文化园建设的项目可行性的研究的报告.doc
- 量子公园——临港综合区九四塘随塘河区域新建工程的项目管理服务招标文件.doc
- 金乡预应力离心混凝土空心方桩专项施工的方案.doc
- 金凯盛铝模的项目部管理规定.docx
- 金地集团内部审计问题的研究论文.docx
- 金堂县淮口镇真武山市政道路一期工程施工二标段旋挖钻孔灌注桩施工的方案.doc
- 金元期货综合数据平台的项目的方案建议书.doc
- 金域蓝湾N1号楼N10号楼及N1N10号楼地下室节能施工的方案.doc
- 金属制品有限公司质量的体系内部审核质量记录.docx
- 19.风是怎样形成的(课件)2025青岛版三年级科学上册.ppt
- 湘科版信息科技三年级下册8单元活动2 保护计算机安全 课件 .ppt
- 1.2.2 声与听觉 课件 2025浙教版科学八年级上册.ppt
- 1.2 认识气温计(教学课件)科学教科版三年级上册(新教材).ppt
- 金融赋能新质生产力的内在逻辑与实现路径.pdf
- 第一单元第一课-认识智慧农业 课件 教科版2025信息科技八年级上册.ppt
- 湘科版信息科技五年级下册第8单元活动1 体验智能语音识别 教学课件.ppt
- 1.2 中国的人口 课件 2025人教版地理八年级上册.ppt
- Unit 1 第5课时 Part B Let’s learnDraw, write and say(教学课件)英语人教PEP版五年级上册(新教材).ppt
- 17.瘪的乒乓球鼓起来了(课件)2025青岛版三年级科学上册.ppt
最近下载
- 【基恩士】LR-W500(C) 使用说明书 (简体中文).pdf VIP
- 《西门子接口模块 ET 200M IM 153 2 产品手册 中文超清版》.pdf VIP
- 2025年全国危险化学品经营单位主要负责人考试试题含答案.docx VIP
- 压力性尿失禁的护理查房PPT课件.pptx VIP
- 九年级下册化学《金属》习题巩固.doc VIP
- 索尼sony_mdsje480_使用说明书手册.pdf VIP
- 城市管理网格员(中级)考试题库(浓缩300题).docx VIP
- 城市管理网格员(四级)认证考试复习题及答案(新版).doc VIP
- (新版)城市管理网格员(四级)认证考试复习题库及答案.docx VIP
- 城市管理网格员(五级)认证考试复习题库(重点题).docx VIP
文档评论(0)