- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
XDM电机中英文对照说明书 - 副本.doc
XDM2系列三相异步电动机随机文件
Documents Provided With 3-Phase Induction Motor
山东华能传动物资贸易有限公司
XDM2系列电机使用维护说明书
▲ 概述
▲ 安装前的准备
▲ 安装
OPERATION AND MAINTENANCE
▲ General
This series motor is three-phase squirrel cage induction motor, which are suitable for driving all kinds of machines, such as metal cutting machine tools, pumps, ventilators, separators, hydraulic machines and other accessory equipments.
▲ Preparation before installation
(1) Check all the data given on the nameplate, such as rated power, voltage, frequency and speed, if they are consistent with the actual demands.
(2) Inspect carefully if the assemblies of all the parts are in condition and if the fixing parts are loose. Turn the rotor by hand to observe if there is any clogging.
(3) Measure the insulation resistance between the phase windings and between windings to the ground with a 500V meager. During operation, the measured value should not be less than 1MΩ otherwise it must be dried.
▲ Installation of Motor
(1) Any axial load will be not allowed in a vertical motor during operation.
(2) The motor must be installed in a well-ventilating condition, and the clearance of the air in taking side of fan hood must not be less than the specified value on table 1.
Table 1
Frame No. H63~132 H160~180 Above H200 Clearance (mm) 25 30 50
(3) The terminal box can be fixed in three directions except of the shaft extension side. If the direction of the terminal box needs changed, it can be moved by removing the four symmetrical bolts on the box.
(4) After punching the rubber pad in the terminal box, the cable may be connected. And the packing nuts must be screwed up in accord with demands of waterproof and shockproof.
(5) It is recommended to use coupling to link the motor, the second shaft must use coupling, if the motor has two shafts. To avoiding damage bearing, the coupling should be heated.
(6) After installation, check all the fixing and joint parts see if they are re
您可能关注的文档
- 、检验检测机构资质认定 证书及其使用要求.docx
- 金矿建设工程可行性研究报告-=页优秀甲级资质可研报告.doc
- 医院各辅检科室医患沟通技巧..docx
- 【最新精选】农网改造施工组织设计.doc
- 第章 现有项目工程分析.doc
- 海康威视ip网络摄像机使用手册(v.).doc
- 新课标-备战2013中考语文复习热点精粹文学作品阅读.doc
- 【精选资料】单层单跨砖混车间施工组织设计.doc
- 工程类或工程经济类专业对照表【最新资料】.doc
- 鄂尔多斯合成氨施工组织设计【建筑施工精品】.doc
- 自习室2025年空间利用率提升策略与效果评估.docx
- B2C企业用户生命周期管理2025年大数据应用报告.docx
- 县域商业体系智能化转型与2025年消费体验优化报告.docx
- 共享健身仓设备智能化升级对健身房行业发展趋势的预测报告.docx
- 2025年县域商业跨界合作与消费市场拓展分析.docx
- 2025年广元市五年级科学期中模拟试卷.doc
- 2025年保健食品产品质量控制与检测技术报告.docx
- 2025年在线医疗平台用户对医疗健康服务未来发展趋势的研究报告.docx
- 2025年跨境电商独立站品牌定位策略:精准市场细分案例解析.docx
- 2025年钢铁行业碳中和目标下的绿色制造技术创新与应用研究报告.docx
文档评论(0)