01_CN_点火燃烧器(一般信息与操作手册)(中文版).docVIP

  • 17
  • 0
  • 约4.81万字
  • 约 35页
  • 2018-07-16 发布于湖北
  • 举报

01_CN_点火燃烧器(一般信息与操作手册)(中文版).doc

PAGE 71 General Information 一般信息BOILER EFFICIENCY DIRECTIVE锅炉效率指令( HOT WATER BOILERS ONLY )(仅热水锅炉)In compliance with the Boiler Efficiency Directive, during commissioning, all adjustments to the burner must be made in accordance with the boiler manufacturers instructions and these must include checking of flue gas temperature, average water temperature and CO2 or CO concentration.调试期间必须遵照锅炉效率指令,按照锅炉生产商说明对燃烧器进行所有调整,这些调整必须包括检查烟气温度、平均水温以及CO2或CO浓度。1.1 General 概述Burners must be checked at the time of delivery and any deficiencies or damage immediately reported to the carrier or supplier. The compa

文档评论(0)

1亿VIP精品文档

相关文档