10KV输电线路施工组织措施及施工方案_.doc

10KV输电线路施工组织措施及施工方案_

PAGE \* MERGEFORMAT 14 10kV配电线路施工组织措施及施工方案 第一章 工程概况及特点···········································2 第二章 施工现场组织机构···········································4 第三章 施工现场总平面布置·········································8 第四章 施工方案·····················································9 第五章 施工综合进度及保证工期措施································14 第六章 质量目标 质量保证体系技术组织措施·························17 第七章 安全目标、安全保证体系及技术措施·························23 第八章 环境保护和文明施工··········································28 第九章 计划统计肯信息管理··········································30 第一章:工程概况及特点 1.1、工程概况 本工程为丹达河35KV变电站-大坝以及35KV变电