水利施工织毕业设计.doc

  1. 1、本文档共57页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水利施工织毕业设计

毕业论文 PAGE 第 PAGE II 页 共 NUMPAGES 56 页 PAGE 59 摘 要 河流上修筑水工建筑物,关系着下游千百万人民生命财产安全。本设计主要论述了柳村水电站施工导流、导流建筑物的形式、围堰的结构设计及稳定分析、混凝土施工等。 柳村电站枢纽位于西藏昌都地区左贡县境内怒江一级支流玉曲河上,为无调节坝后式小型水电站。该电站由拦河坝、泄洪建筑物、引水建筑物及电站厂房组成。电站设计装机容量为2×800kW,施工总工期2年。本枢纽导流建筑物为V级,电站施工导流设计流量采用平水年平均径流流量Q=49.36 m3 混凝土施工组织设计包括混凝土的配制,混凝土的浇筑,混凝土的温度控制,混凝土的养护,钢筋及模板作业等。柳村电站枢纽为浆砌石硬壳坝,混凝土施工主要在电站厂房坝段、溢流面、上游面板及下游消能池。 关键词:施工导流,全段围堰法,分段围堰法,混凝土施工 Abstract Build the water conservancy project building on the river , is concerning a great amount of peoples safety of life and property of low reaches . Is it expound the fact Liucun power station construct water conservancy diversion , form , structural design and steady analysis ,concert construction ,etc. of cofferdam , water conservancy diversion of building mainly to design originally. The hydropower station of Liucun lies within the boundaries of Zuogong county of Qamdo Prefecture of Tibet on Nujiang first class tributary Yuqu river, for not regulating the small-scale power station of the type after the dam. Hydropower station by dam, release floodwater building , channel water the building and hydropower station factory building make up. Design installed capacity 2×800kW , always constructs for 2 years of time limit. This pivot water conservancy diversion building V grade, hydropower station construct water conservancy diversion adopt and design the flow of flood crest while being the first stage of 49.36m3/s, adopt and does not design flow in flood season non- while being the second stage of 117.5m3 The concrete construction organization designs include theconcrete configuration, concrete constructing, the concrete temperature control, concrete maintenance, the steel bar and the template work and so on. The hydropower station of Liucun

文档评论(0)

189****1013 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档