HONEYWELL-PKS-PID控制模块应用.pdfVIP

  1. 1、本文档共46页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
HONEYWELL-PKS-PID控制模块应用

Topic: Cascade PID Control Module Contents Configure a Cascade PID Control Module 3 8/2/2004 ExperionPKS Control Execution Environment EXP04R201 1 Honeywell, Inc. This page was intentionally left blank. 2 ExperionPKS Control Execution Environment EXP04R201 8/2/2004 Honeywell, Inc. Cascade PID Control Module Configure a Cascade PID Control Module Configure a Cascade PID Control Module Practice Objective Configuring a cascade controller for T-100 bottom level control. Prerequisites • Experion PKS Server or a Client machine with Experion PKS Engineering Tools loaded. • Check if the Debutanizer_123 graphic is loaded on the Server. (This is required at a later time to check the control philosophy). • Control Builder is running with two tree windows open. • The SCE Controller and the IOMs are configured. • Excel Data Exchange open with the simulation spread sheet loaded. Introduction The first Cascade loop built is LC14, the T-100 bottom level control. Although the loop has two secondaries -- FC17 and FC18 -- in this lab the cascade is built with just 11_FC17. 11_ FC18 is configured in the next lab. The PID shows that this loop has an interlock with the bottom safety valve and is the Primary to both outlet streams (FC17 and FC18). LSD15 is driven by interlock logic, which trips the valve in the event of a low level. The trip is reset when the level is above 5%. The comparator for 5% will also be configured. The interlock (11_LSD15) will be imported into the proj ect. The cascade loop, with LC14 as primary and FC17 as secondary, will be built, and downloaded in this lab. However, the f

文档评论(0)

zhengshumian + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档