中文版船舶买卖合同 .docVIP

  • 3
  • 0
  • 约1.05万字
  • 约 8页
  • 2018-10-29 发布于广东
  • 举报
中文版船舶买卖合同 .doc

5.1 DURING THE TERM OF THIS CONTRACT, WHERE THE BUILDING PROCESS OF THE VESSEL IS DELAYED BY AGREED MODIFICATIONS, EARTHQUAKE, TSUNAMI, TYPHOON, HURRICANE, FLOOD, PLAGUE AND OTHER INSURMOUNTABLE OBJECTIVE CONDITIONS,WHICH ARE OUT OF THE SEL LEFTS REASON ABLE CONTROL OR DUE TO THE OCCURRENC ESOF SUCH F ORCE MAJEURETO THE SUPP HER OF THE MATERIALS OR EQUIPMENTS,SUCH DELAY IS DEEMED AS PERMISSIBLE (HEREINAFTE R PERMISSIBLE DELAYn).BUT THE SELLER MUST TAKE RESPONSIBLE FOR SUCH UN EXPECTED LOST. 5.2 THE SELLER SHAL L FAX THE BU YER A WRITTE N NOTICE OF SUCH FORCE M AJEURE EVENT WITHIN 7 DAYS UPON I

文档评论(0)

1亿VIP精品文档

相关文档