深基坑土钉墙支护结构分析的探讨

深基坑土钉墙支护结构分析的探讨   摘要:本文根据《建筑基坑支护技术规程》(TGJ120-99)中有关土钉墙设计的规定,按程序列出了土钉墙的计算公式,并与目前常用的简化法,通过实例进行了对比,探讨了两种方法的异同、适用范围及存在的问题,供有关方面参考。   关键词:建筑基坑土钉墙土体潜在破裂面、破裂角,土钉墙稳定性校核   Abstract: according to the technical code for building foundation pit shoring ( TGJ120-99 ) on soil nailing wall design rules, according to the procedures set out in the calculation formula of soil nailing wall, and with the current commonly used method, through the examples were compared, and discusses two kinds of methods between, the applicable scope and the existing problems, for reference.   Key words: building excavation,