- 5
- 0
- 约2.96万字
- 约 10页
- 2018-11-16 发布于天津
- 举报
电脑摇头光束灯-双棱镜
需要帮助?
在线帮助:
11. Maintenance and Cleaning
电脑摇头光束灯-双棱镜
The following points have to be considered during the inspection:
1) All screws for installing the devices or parts of the device have to be tightly connected and must not be (DF-BEAM230)
corroded.
2) There must not be any deformations on the housing, color lenses, fixations and installation spots (ceiling,
suspension, trussing).
3 )Mechanically moved parts must not show any traces of wearing and must not rotate with unbalances.
4 )The electric power supply cables must not show any damage, material fatigue or sediments.
Further instructions depending on the installation spot and usage have to be adhered by a skilled installer and
any safety problems have to be removed.
In order to make the lights in good condition and extend the life time, we suggest a regular cleaning to the lights.
1) Clean the inside and outside lens each week to avoid the weakneness of the lights due to accumulation of
dust.
2) Clean the fan each week.
3) A detailed electric check by approved electrical engineer each three month, make sure that the circuit
contacts are in good condition, prevent the poor contact of circuit from overheating.
We recommend a frequent cleaning of the device. Please use a moist, lint- free cloth. Never use alcohol or
solvents.
There are no serviceable parts inside the device. Please refer to the instructions under “Installation instructions”. 用户手册
Should you need any spare parts, please order genuine parts from your local dealer.
修订日期:2015 年10 月 广州多芬灯光设备有限公司
您可能关注的文档
最近下载
- 第十章血脂及浆脂蛋白检验.doc VIP
- GB 50207-2012 屋面工程质量验收规范.docx VIP
- 高铁乘务人员形体训练全套教学课件.pptx
- 六年级上册道德与法治知识点.docx VIP
- 2026年课件-《成人患者医用粘胶相关性皮肤损伤的预防及护理》团体标准解读2026-新版.pdf
- 2017-2018年度零售业消费者满意度调查报告.pdf VIP
- 〖初中数学〗整式的乘法 课件 2024--2025学年北师大版七年级数学下册.pptx VIP
- 深度解析(2026)《SYT 5679-2017钻井液用降滤失剂 褐煤树脂 SPNH》.pptx VIP
- 12J201 平屋面建筑构造图集.docx VIP
- 社会调查研究计划书.docx VIP
原创力文档

文档评论(0)