网站大量收购闲置独家精品文档,联系QQ:2885784924

大型越江盾构隧道工程项目的风险管理研究-建筑与土木工程专业论文.docx

大型越江盾构隧道工程项目的风险管理研究-建筑与土木工程专业论文.docx

  1. 1、本文档共57页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型越江盾构隧道工程项目的风险管理研究-建筑与土木工程专业论文

摘要 A STUDY OF RISK MANAGEMENT FOR LARGE-SCALE CROSS-RIVER SHIELD TUNNEL PROJECTS ABSTRACT With the growing size of the cities, construction land increasingly scarce. In according to the target of “build the road on air, find the channel underground”, the project of highway, bridge and tunnel have developed quickly during these years. Especially in the cross-river transportation project, with the property of superior transportation capacity, independent to the navigable waterways, the tunnel projection has become more and more applications. The tunnel construction is a complex system project includes many types of subjects. It has the properties of large investment, complicated technology, long construction period, large components of the structure, wide concerned areas of the project and so on. During the construction of the tunnel project, there are many risks and unsure factors, these risks have the complex, diversity, comprehensive, and accidental property. So the importance of the projects management research for the construction of large scale underwater shield tunnel is more and more important. In this paper, the Nanjing Yangtze River Tunnel project case, based on the establishment of large-scale cross-river tunnel project risk management framework. In this paper, based on the theory of risk management, make the risk management approach and methods clear. Using investigation and analysis method to identify risk, determine common factors of the construction of large scale underwater shield tunnel. So as to achieve the purpose of risk control. Through the examples of the Nanjing Yangtze River Tunnel, this paper verifies the research contents. The result shows that the model and method can solve the real problem well. This research can provide reference for the identification, evaluation and management of the project. KEYWORDS: projects management, risk management, shield, large scale underwater tunnel - II - 上海交通大学 上海交通大学 - - 学位论文原创性声明 本人郑重声明 z 所呈交的学位论文,是本人在导师的

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档